The purpose of this recommended practice is to provide a general form for the preparation of test procedures and to suggest the points to be considered by technical committees in the preparation of specific instructions for the thermal evaluation of insulation systems for power equipment. These test procedures involve accelerated thermal aging of insulation systems and specify tests which the committees deem pertinent, based on conditions of use.
- Sponsor Committee
- BOG/SESCom/SC04 - SC04 - Electrical Insulation
- Status
- Superseded Standard
- Superseded by
- 99-2007
- Superseding
- 99-1970
- Board Approval
- 1978-12-14
- History
-
- ANSI Approved:
- 1983-04-29
- Published:
- 1980-07-18
- Reaffirmed:
- 2000-09-21
Working Group Details
- Society
- Sponsor Committee
- BOG/SESCom/SC04 - SC04 - Electrical Insulation
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards