Withdrawn Standard. Withdrawn Date: Feb 06, 2006. The application and performance requirements for a low-voltage uninterruptible power supply (UPS) system used for service in power generating stations are defined. Service conditions and requirements for design application, procurement documents, and testing are covered. The recommendations apply only to semiconductor ac-to-ac converter systems (static) with dc electric energy storage capability. Equipment or component design requirements, safety-related design criteria, or requirements for equipment qualification and preoperational/surveillance testing are not addressed.
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
- Status
- Inactive-Withdrawn Standard
- Board Approval
- 1985-12-12
- History
-
- Withdrawn:
- 2006-02-06
- ANSI Approved:
- 1986-06-09
- Published:
- 1986-06-30
- Reaffirmed:
- 1996-03-21
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/EDPG - Energy Development & Power Generation
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards