Active PAR

P422

Guide for the Design of Cable Raceway Systems for Electric Generating Facilities

This document provides guidance for the design and installation of cable raceway systems for all types of electric generating facilities.

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Joint Sponsors
PE/IC
Status
Active PAR
PAR Approval
2022-09-21
Superseding
422-2012

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Working Group
SDOC - WG 422 - Design of Cable and Raceway Systems in Electric Generating Stations Working Group
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Tim Fallesen

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


422-2012

IEEE Guide for the Design of Cable Raceway Systems for Electric Generating Facilities

Guidance for the design and installation of cable raceway systems for all types of electric generating facilities is provided. Recommendations, methods, and best engineering practices for the design of cable raceway systems including selection of equipment, materials, and the configuration of raceway are described.

Learn More About 422-2012

Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.