Activities related to motor-starting studies, including design considerations for new systems, analytical studies for existing systems, as well as operational and model-validation considerations for industrial and commercial power systems are described. Motor-starting analysis includes evaluation of motor-starting current and voltage drop. Accuracy of calculation results primarily relies on system modeling assumptions and methods used. The use of computer-aided analysis software, with a list of desirable capabilities recommended to conduct a modern motor-starting study, is emphasized. Examples of system data requirements and result-analysis techniques are presented. Benefits obtained from motor-starting studies are discussed, and various types of computer-aided motor-starting studies are examined. Data or information required for these studies, as well as the expected results of a motor-starting study effort, are also reviewed.
- Standard Committee
- IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
- Status
- Active Standard
- PAR Approval
- 2008-06-12
- Board Approval
- 2018-12-05
- History
-
- Published:
- 2019-04-26
Working Group Details
- Society
- IEEE Industry Applications Society
- Standard Committee
- IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
- Working Group
-
P1668 - P1668 Working Group
- IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- Mark Stephens
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards