Active Standard

IEEE 2819-2022

IEEE Recommended Practice for Measuring Method of Electromagnetic Environment for the Corridor of High--Voltage Overhead Power Transmission Lines in Parallel Mixed with Alternating Current and Direct Current

Uniform procedures for the measurement of the power frequency electric field and dc electric field when ac/dc power transmission lines are installed in parallel or on shared towers are established in this recommended practice. Based on the mutual influence analysis between parallel ac/dc power transmission lines through the theoretical calculation and on-site measurements, the specification requirements and calibration methods of electric field meters are specified. The measurement ranges and layout of measurement points, data recording and processing, and result evaluation methods of parallel power transmission lines of different voltage levels are standardized. This recommended practice is applicable to electromagnetic environment measurement of ac transmission lines with a voltage not less than 100 kV, dc transmission lines with a voltage not less than ± 400 kV, and parallel transmission lines with a distance not over 100 m.

Sponsor Committee
PE/T&D - Transmission and Distribution
Status
Active Standard
PAR Approval
2019-06-13
Board Approval
2022-03-24
History
Published:
2022-06-10

Working Group Details

Society
IEEE Power and Energy Society
Sponsor Committee
PE/T&D - Transmission and Distribution
Working Group
WG_paraline_EMM_p2819 - WG for measuring method of electromagnetic environment for the corridor of highvoltage OPTL mixed with AC and DC in parallel
IEEE Program Manager
Meng Zhao
Contact Meng Zhao
Working Group Chair
Degui Yao

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.