Active PAR

P2800.2

Recommended Practice for Test and Verification Procedures for Inverter-based Resources (IBRs) Interconnecting with Bulk Power Systems

This document defines recommended practices for test and verification procedures that should be used to confirm plant-level conformance of inverter-based resources (IBRs) interconnecting with bulk power systems in compliance with IEEE Std 2800. The document applies to IBRs in transmission and sub-transmission systems, as defined by the connecting utility. The document may also apply to isolated IBRs that are interconnected to an alternating current (AC) transmission system via dedicated voltage source converter high-voltage direct current (VSC-HVDC) transmission facilities, e.g., offshore wind farms. This recommended practice complements the IEEE 2800 test and verification framework with specifications for the equipment, conditions, tests, modeling methods, and other verification procedures that should be used to demonstrate conformance with IEEE P2800 technical minimum requirements for interconnection, capability, and performance of applicable IBRs.

Standard Committee
PE/EDPG - Energy Development & Power Generation
Joint Sponsors
PE/EM
PE/T&D
PE/AMPS
PE/PSRCC
Status
Active PAR
PAR Approval
2021-05-21

Working Group Details

Society
IEEE Power and Energy Society
Standard Committee
PE/EDPG - Energy Development & Power Generation
Working Group
P2800.2 - T&V of BPS-connected IBRs - P2800.2 - Test and Verification of BPS-connected Inverter-Based Resources
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Anderson Hoke

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.