Active PAR

P2800.1

Guide for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Associated Transmission Electric Power Systems

This guide provides test and verification procedures for inverter-based resources interconnecting with transmission electric power systems. This guide specifies the test equipment, test conditions and test and verification methods for type tests, production tests, facility design and as-built evaluations and commissioning tests to be performed to demonstrate the interconnection capabilities and functions for equipment connected with transmission electric power systems. Included in the test and verification procedures are all performance and functional requirements for reliable integration of inverter-based resources into the power grid, including, but not limited to, voltage and frequency ride-through performance, reactive power control, power quality, and dynamic voltage support under abnormal voltage conditions. This guide may also specify verification procedures for generic steady-state short-circuit models for fault analysis, as well as, generic, fundamental frequency, stability-type models (root-mean-square, rms with positive-sequence and possibly negative-sequence representation) of inverter-based resources interconnecting with transmission electric power systems for bulk system stability studies and/or proprietary time-domain (electromagnetic transient, emt) models for verification of interconnection requirements of composite systems (facilities) at the point of interconnection..

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Joint Sponsors
PE/EM
Status
Active PAR
PAR Approval
2018-09-27

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Working Group
WSPPID/WSPI/WSPI-TV - Wind and Solar Plant Interconnection Test and Verification Working Group (WSPI-TV)
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
LIANG GUO

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.