This guide provides comprehensive test methods for the pantograph off-line and the reasonable evaluation for the performance of current collection system in high-speed railway. Model for the arcing erosion, as well as the off-line induced transient overvoltage and harmonics, which impact the onsite devices' safety are included.
- Standard Committee
- VT/HSTMSC - High Speed Train and Maglev Standards Committee
- Status
- Active Standard
- PAR Approval
- 2018-03-08
- Board Approval
- 2022-03-24
- History
-
- Published:
- 2022-05-30
Working Group Details
- Society
- IEEE Vehicular Technology Society
- Standard Committee
- VT/HSTMSC - High Speed Train and Maglev Standards Committee
- Working Group
-
measurement of pantograph off- - Guide for the measurement of pantograph off-line and evaluation of current collection performance for high speed railway
- IEEE Program Manager
- Meng Zhao
Contact Meng Zhao - Working Group Chair
- Wenfu Wei
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards