Active PAR

P1793

Guide for Planning, Design, and Installation of Transition Facilities between Overhead and Underground Transmission Lines

This guide presents factors to be considered in the planning, design, and installation of transition facilities between overhead and underground transmission lines. These include the system implications of a hybrid installation as they relate to the transition facility. While this document focuses on transmission lines, some of the considerations listed in this guide are common to transmission, distribution, and substation installations.

Sponsor Committee
PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors
Joint Sponsors
PE/T&D
Status
Active PAR
PAR Approval
2023-09-21
Superseding
1793-2012

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors
Working Group
C23W/P1793_WG - Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines
IEEE Program Manager
Dalisa Gonzalez
Contact Dalisa Gonzalez
Working Group Chair
Nathan Rochel

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


1793-2012

IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines

Careful consideration of the physical and electrical characteristics of overhead lines and transmission cables are necessary in designing a transition structure between the two systems. Environmental and social factors also play a role in designing a transition. By considering the factors contained in this guide, the user will be better able to design a suitable transition that balances cost, operability, environmental factors, and future flexibility.

Learn More About 1793-2012

Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.