Active Standard

IEEE 1732-2017

IEEE Recommended Practice for Space Charge Measurements on High-Voltage Direct-Current Extruded Cables for Rated Voltages up to 550 kV

The aim of this recommended practice is establishing a protocol for the measurement of space charges in high-voltage direct-current (HVDC) extruded cables having rated voltage up to 550 kV. Such measurements are prescribed to be carried out at the beginning and at the end of load cycle qualification tests (either the long-duration voltage test of prequalification tests or the load cycle test of type tests). The various steps of the protocol for the measurement of space charges in such cables are carefully described. Details are given about the procedure for applying and switching off the voltage, the preparation and conditioning of specimens, the measurement times during poling and depolarization, and the calculations for checking electric field stabilization. The ultimate goal of this recommended practice is not verifying the compliance with any maximum acceptable limit of either space charge or electric field, but rather assessing the variation of the electric field profile in the cable insulation wall during load cycle qualification tests.

Standard Committee
DEI/SC - Standards Committee
Status
Active Standard
PAR Approval
2015-10-26
Board Approval
2017-03-23
History
Published:
2017-06-26

Working Group Details

Society
IEEE Dielectrics and Electrical Insulation Society
Standard Committee
DEI/SC - Standards Committee
Working Group
HVDC WG - Working Group for HVDC cable systems (cables, joints and teminations) (DEI/SC/HVDC cable systems)
IEEE Program Manager
Dalisa Gonzalez
Contact Dalisa Gonzalez
Working Group Chair
Giovanni Mazzanti

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.