A non-industry-specific recommended practice for voltage sag and short interruption ride-through performance and compliance testing for all electrical and electronic equipment connected to low-voltage power systems that can experience malfunction or shutdown as a result of reductions in supply voltage lasting less than one minute is detailed in this document. Testing procedures and requirements for test equipment are clearly defined within this document to reflect this electrical environment, including single-phase, two-phase, and three-phase balanced and unbalanced voltage sags. Requirements for certification and test reporting, including characterization of voltage-sag ride-through equipment are also defined.
- Sponsor Committee
- IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
- Status
- Active Standard
- PAR Approval
- 2016-06-30
- Superseding
- 1668-2014
- Board Approval
- 2017-06-15
- History
-
- ANSI Approved:
- 2019-03-22
- Published:
- 2017-11-27
Additional Resources
- Erratas
- 1668-2017_errata.pdf
Working Group Details
- Society
- IEEE Industry Applications Society
Learn More About IEEE Industry Applications Society - Sponsor Committee
- IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
- Working Group
-
P1668 - P1668 Working Group
- IEEE Program Manager
- Michael Kipness
Contact Michael Kipness - Working Group Chair
- Mark Stephens
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
P1668
Recommended Practice for Voltage Sag and Short Interruption Ride-Through Testing for End-Use Electrical Equipment Rated Less than 1000 V
This is a non-industry-specific recommended practice for voltage-sag ride-through performance and compliance testing for all electrical and electronic equipment connected to low-voltage power systems (with nominal/rated voltage less than 1000 V) that can experience malfunction or shutdown as a result of reductions in supply voltage lasting less than one minute. The recommended practice includes defining minimum voltage-sag immunity requirements based on actual voltage-sag data. A clause dedicated to the detailed analysis of voltage sags experienced by end users provides insight into real-world voltage sags. Testing procedures and requirements for test equipment are clearly defined within this document to reflect the electrical environment, including single-phase, two-phase, and three-phase, balanced and unbalanced voltage sags. The recommended practice also defines requirements for certification and test reporting, including characterization of voltage-sag ride-through equipment.
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards