This guide covers the quality acceptance and maintenance tests of shielded insulated power cable systems rated 5 kV and above in the field. It provides instructions for the test setups, the required test voltage levels, the test procedures for simple withstand (with no Partial Discharge [PD] monitoring) and PD monitored withstand as well as guidance for the evaluation of test data.
- Standard Committee
- PE/IC - Insulated Conductors
- Status
- Active PAR
- PAR Approval
- 2024-03-21
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/IC - Insulated Conductors
- Working Group
-
F11W - Constant Voltage AC Field Testing
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Mark Fenger
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards