IEEE Guide for Electrical and Control Design of Hydroelectric Water Conveyance Facilities

Electrical and control design of water conveyance facilities associated with hydroelectric projects including associated penstocks, valves, and gates are described in this guide. Guidance to plan and prepare designs is included. Installation, operation, or maintenance guideline and methodologies are not included. Design of new facilities and rehabilitation or replacement of existing facilities is covered. Comprehensive considerations for design, monitoring, control, protection, and operation of water conveyance facilities associated with hydroelectric projects is provided. Guidance in electrical and instrumentation work unique to water conveyance systems is provided. Guidance for the safe control of water release systems, bypass systems, and failure modes are provided. Reliability measures such as redundancy and power source considerations are provided. Gate and valve types and associated operating mechanisms are introduced. Power and non-power water conduits including penstocks, tunnels, and canals are covered.

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Status
Active Standard
PAR Approval
2010-06-17
Board Approval
2016-12-07
History
ANSI Approved:
2018-04-27
Published:
2017-03-31

Working Group Details

Society
IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Working Group
HPS - WG 1827 - HPS - Electrical & Control Design of Hydroelectric Water Conveyance Facilities Working Group
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P1827
Guide for Electrical and Control Design of Hydroelectric Water Conveyance Facilities

This guide describes the electrical and control design of water conveyance facilities associated with hydroelectric projects including associated penstocks, valves, and gates. The guide includes guidance to plan and prepare designs; however, it does not include details of installation, operation, or maintenance guidelines and methodologies. This guide is applicable to design of new facilities and rehabilitation or replacement of existing facilities.

Learn More About P1827

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.