Corrections to IEEE Std 2893-2023 are provided in this corrigendum
- Sponsor Committee
- COM/PLC - Power Line Communications
Learn More About COM/PLC - Power Line Communications - Status
- Active Standard
- PAR Approval
- 2023-11-08
- Board Approval
- 2024-09-26
Working Group Details
- Society
- IEEE Communications Society
Learn More About IEEE Communications Society - Sponsor Committee
- COM/PLC - Power Line Communications
Learn More About COM/PLC - Power Line Communications - Working Group
-
OSUFlexWG - Flexible Optical Service Unit (OSUFlex) of Optical Transport Network (OTN) in power systems
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- Hongzhen Yang
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
2893-2023
IEEE Approved Draft Standard for Flexible Optical Service Unit (OSUFlex) of Optical Transport Network (OTN) in Power Systems
This standard specifies a communication layer, Flexible Optical Service Unit (OSUFlex) to provide small service channels in optical transport networks. The main features of the OSUflex communication layer are providing massive OSUflex connections to directly carry power services (e.g. E1 or IEEE C37.94) into an optical transport network, enabling the flexible bandwidth (e.g. n u00d7 2 Mb/s) and hitless bandwidth adjustment for each OSUflex connection, direct mapping of services into OSUflex with the capabilities of high-bandwidth efficiency, low latency, low latency jitter and high-precision clock synchronization for power system applications.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards