This guide provides information about what factors to consider when applying IEC 61850 GOOSE and Sampled Values to monitor and diagnose communication of automation systems.
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Status
- Active PAR
- PAR Approval
- 2018-03-08
Working Group Details
- Society
- IEEE Power and Energy Society
- Standard Committee
- PE/PSRCC - Power System Relaying and Control
- Working Group
-
H44_P2030.100.1 - P2030.100.1_WGH-44 Monitoring and Diagnostics of IEC 61850 GOOSE and Sampled Values based systems
- IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- Aaron Martin
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards