A step-by-step process for selecting an appropriate termination that is commensurate with a particular shielded power cable design is provided in this guide. Over the years, shielded power cables have been developed that employ many different insulating materials and many different shielding systems, such that, there are numerous issues to consider when selecting a termination for a particular cable design. Over the same period of time, many different termination methods and designs have been developed that serve the same purpose, but employ different application methodologies. No attempt is made in this guide to cover every cable and termination design, and it is generally restricted to single conductor underground residential distribution (URD) and shielded power cable that have a voltage rating from 5 kV to 46 kV, which includes some industrial cables. By nature, the terminations referred to in this guide are considered to be "live front," in that the terminations comprise a transition from a shielded power cable system to an energized component or bus that is either bare or simply covered.
- Sponsor Committee
- PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors - Status
- Active Standard
- PAR Approval
- 2020-03-05
- Superseding
- 1637-2010
- Board Approval
- 2020-09-24
- History
-
- Published:
- 2021-02-05
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society - Sponsor Committee
- PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors - Working Group
-
B10W/P1637_WG - Shielded Power Cables Working Group
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez - Working Group Chair
- William Taylor
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards