
This recommended practice presents tests to determine the performance of stand-alone photovoltaic (PV) systems and for verifying PV system design. These tests apply only to complete systems with a defined load. Performance testing is conducted outdoors under prevailing conditions over a period of about one month. These tests are intended to assist designers, manufacturers, system integrators, system users, and laboratories that will conduct the tests. System safety and component reliability issues are not addressed in this recommended practice.
- Standard Committee
- BOG/SC21 - Distributed Generation, Energy Storage and Interoperability Standards Committee
- Status
- Superseded Standard
- PAR Approval
- 1998-03-19
- Superseded by
- 1526-2020
- Board Approval
- 2003-09-11
- History
-
- ANSI Approved:
- 2003-12-29
- Published:
- 2004-01-29
- Reaffirmed:
- 2009-12-09
Working Group Details
- Society
- Society
- IEEE SA Board of Governors
- Standard Committee
- BOG/SC21 - Distributed Generation, Energy Storage and Interoperability Standards Committee
- Working Group
-
WG_ 1526_Energy_Storage - Test Procedures for Equipment Interconnecting Electric Energy Storage with Electric Power Systems working group
- IEEE Program Manager
- Malia Zaman
Contact Malia Zaman - Working Group Chair
- Yiming Hou
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
1526-2020
IEEE Recommended Practice for Testing the Performance of Stand-Alone Photovoltaic Systems
Tests to determine the performance of stand-alone photovoltaic (PV) systems and for verifying PV system design are presented in this recommended practice. These tests apply only to complete systems with a defined load. The methodology includes testing the system outdoors in prevailing conditions and indoors under simulated conditions. The tests are intended to assist designers, manufacturers, system integrators, system users, and laboratories that will conduct the tests. System safety and component reliability issues are not addressed in this recommended practice.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards