This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.
- Sponsor Committee
- PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation - Status
- Inactive-Reserved Standard
- PAR Approval
- 2013-06-14
- Superseding
- 1249-1996
- Board Approval
- 2013-06-14
- History
-
- Published:
- 2013-09-27
- Inactivated Date:
- 2024-03-21
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society - Sponsor Committee
- PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation - Working Group
-
HPS - WG 1249 - HPS - Computer Based Controls for Hydroelectric Power Plant Automation Working Group
- IEEE Program Manager
- Vanessa Lalitte
Contact Vanessa Lalitte - Working Group Chair
- James Volk
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
P1249
Guide for Digital Control for Hydroelectric Power Plant Automation
This guide addresses the application, design concepts, and implementation of digital control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
62270-2013
IEC/IEEE Guide for Computer-based Control for Hydroelectric Power Plant Automation
This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards