IEEE Guide for the Rehabilitation of Hydroelectric Power Plants

Reaffirmed March 2012. This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Status
Superseded Standard
PAR Approval
2001-09-27
Superseded by
1147-2021
Superseding
1147-1991
Board Approval
2005-09-22
History
ANSI Approved:
2006-01-26
ANSI Withdrawn Date:
2016-08-19
Published:
2006-03-22
Reaffirmed:
2012-03-29

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More About PE/EDPG - Energy Development & Power Generation
Working Group
HPS - WG 1147 - HPS - Rehabilitation of Hydroelectric Power Plants Working Group
IEEE Program Manager
Vanessa Lalitte
Contact Vanessa Lalitte
Working Group Chair
Randall Groves

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


1147-2021

IEEE Guide for the Rehabilitation of Hydroelectric Power Plants

This guide is intended for the hydroelectric power industry to assist hydroelectric power plant owners, operators, and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existing hydroelectric installations for rehabilitation. It addresses conventional hydropower. Portions of this guide are relevant to pumped storage, but the unique features of pumped storage are not covered. Feasibility study results may indicate redevelopment of the site. Redevelopment will not be treated in detail in this guide. This guide covers all generating equipment up to and including the main transformer and typical auxiliary equipment.

Learn More About 1147-2021

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter