Standard Details
Single-phase instrument transformers of a nominal system voltage of 115 kV and above with capacitive insulation system for line-to-ground connection and for both indoor and outdoor application are discussed in this standard. This standard is intended for use as a supplement to IEEE Std C57.13™-2008 and as a basis for performance and safety of equipment. It also describes test sequences, criteria, methods and documentation for the test.
Sponsor Committee | |
Status |
Active
|
Board Approval |
2009-09-11
|
History |
Published Date:2009-12-30
|
Additional Resources Details
Pars | |
Redline | |
Historical Base Standard |
Working Group Details
Working Group |
Instrument-WGC57.13.5 - Instrument Transformers - Test Req. for >=115kV Working Group
|
Working Group Chair |
Pierre Riffon
|
Sponsor Committee | |
Society | |
IEEE Program Manager | |
Active Projects |
This standard is intended for use as a supplement to IEEE Std C57.13 and as a basis for performance and safety of equipment. It also describes test sequences, criteria, methods and documentation for the test.
This standard applies to single-phase instrument transformers of a nominal system voltage of 115 kV and above with capacitive insulation system for line-to-ground connection and for both indoor and outdoor application.
|
Existing Standards |
This trial-use standard covers the test requirements, including test sequences, criteria, methods, and documentation for instrument transformers of 115 kV nominal system and above. It is to be used a supplement to IEEE STDPD C57.13 ?-1993. Besides the provision of up-to-date test requirements, the trial-use standard also provides test procedures that were not adequately covered in the previous standard.
|