General test procedures for performing routine quality control tests that are suitable for high-volume, production line testing are included in this recommended practice. Transformer connections, test methods, circuit configurations, and failure detection methods are addressed. This recommended practice covers liquid-immersed, single- and three-phase distribution transformers.
Standards Committee | |
Status |
Active
|
Board Approval |
2016-12-07
|
History |
Published Date:2017-03-31
|
Additional Resources Details
PAR |
Working Group Details
Working Group |
Dielectric-WGC57.138 - Dielectric Tests - Rev. routine impulse test for distribution transformers
|
Working Group Chair |
Arthur Molden
|
Standards Committee | |
Society | |
IEEE Program Manager | |
Existing Standards |
Transformer connections, test methods, circuit configurations, and failure analysis of lightning impulse and switching impulse testing of power transformers are addressed. This guide is also generally applicable to distribution and instrument transformers.
|
Guidance on the use of outdoor power apparatus bushings is provided. The bushings are limited to those built in accordance with IEEE Std C57.19.00-1991. General information and recommendations for the application of power apparatus bushings, when incorporated as part of power transformers, power circuit breakers, and isolated-phase bus, are provided.
|
|
IEEE C57.138-1998 - IEEE Recommended Practice for Routine Impulse Test for Distribution Transformers
General test procedures for performing routine quality control test that is suitable for high-volume, production line testing. Transformer connections, test methods, circuit configurations, and failure detection methods are addressed. This recommended practice covers liquid-immersed, single-and three-phase distribution transformers.
|