Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) Techniques focusing on the overall accuracy and availability of the time synchronization system; (c) Test and calibration procedures for PMUs for laboratory and field applications; (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).
Standards Committee | |
Status |
Active
|
Board Approval |
2013-02-06
|
History |
Published Date:2013-03-06
|
Additional Resources Details
PAR |
Working Group Details
Working Group |
C37.242_WG - Guide for Synchronization, Calibration, Testing, and instalation of (PMU) for power system protection and control
|
Working Group Chair |
Allen Goldstein
|
Standards Committee | |
Society | |
IEEE Program Manager | |
Active Projects |
Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) Techniques focusing on the overall accuracy and availability of the time synchronization system; (c) Test and calibration procedures for PMUs for laboratory and field applications; (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).
|