Inactive-Withdrawn Standard

IEEE 510-1983

IEEE Recommended Practices for Safety in High-Voltage and High-Power Testing

Safety practices for those who are involved with making measurements on high-voltage sources or with high-power sources of various types, including power-system lines, 60-Hz test transformers, direct-voltage supplies, lightning-impulse generators, and switching-impulse generators are recommended. Electrical hazards involved in temporary measurements, as opposed to metering, relaying, or routine line work, are considered. Safety is considered in connection with testing in laboratories, in the field, in substations, and on lines, and with the test equipment utilized. Cable-fault location, large-capacitance-load testing, high-current testing, and direct connection to power lines are treated separately.

Sponsor Committee
PE/PSIM - Power System Instrumentation and Measurements
Status
Inactive-Withdrawn Standard
Board Approval
1981-09-17
History
Withdrawn:
2005-01-25
ANSI Approved:
1992-09-22
Published:
1983-05-09
Reaffirmed:
1992-03-19

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/PSIM - Power System Instrumentation and Measurements

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.