Standard Details
Although the storage battery is of primary importance in assuring the satisfactory operation of
generating stations and substations, no single up-to-date guide exists to aid engineers in sizing the battery for a particular installation. This Recommended Practice is based on commonly accepted
methods used to define the load and to ensure adequate battery capacity. The method described is
applicable to all installations and battery sizes. The installations considered herein are designed for "full float" operation with a battery charger
serving to maintain the battery in a charged condition as well as to supply the normal dc load.
Status |
Superseded
|
Superseded by | |
Board Approval |
1977-09-08
|
History |
Published Date:1978-07-12
|