Inactive-Reserved Standard

IEEE 1783-2009

IEEE Guide for Test Methods and Procedures to Evaluate the Electrical Performance of Insulators in Freezing Conditions

The guide specifies procedures for testing equipment when external insulation of the test object is subjected to combinations of contamination, ice, snow, or cold fog. The methods are applicable only to tests on equipment with a rated voltage above 1 kV.

Sponsor Committee
DEI/SC - Standards Committee
Learn More About DEI/SC - Standards Committee
Status
Inactive-Reserved Standard
PAR Approval
2008-03-27
Board Approval
2009-06-17
History
ANSI Approved:
2009-10-08
Published:
2009-10-17
Inactivated Date:
2020-03-05

Working Group Details

Society
IEEE Dielectrics and Electrical Insulation Society
Learn More About IEEE Dielectrics and Electrical Insulation Society
Sponsor Committee
DEI/SC - Standards Committee
Learn More About DEI/SC - Standards Committee
Working Group
P1820 WG_ICING - DEI-Performance of Insulators in Freezing Conditions
IEEE Program Manager
Dalisa Gonzalez
Contact Dalisa Gonzalez
Working Group Chair
William Chisholm

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


No Active Projects

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


1820-2020

IEEE Guide on the Selection of Transmission and Distribution Insulators with Respect to Cold Weather Conditions

Procedures for selecting external insulation that is likely to be subjected to an outdoor environment that includes combinations of contamination, ice, snow, or cold fog are specified by this guide. The selection methods are applicable to insulators, surge arresters, bushings, live line tools and other high voltage ac and dc apparatus with a rated voltage above 1 kV.

Learn More About 1820-2020

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.