Standard Details
This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.
Standards Committee | |
Status |
Active
|
Board Approval |
2013-06-14
|
History |
Published Date:2013-09-27
|
Additional Resources Details
PAR |
Working Group Details
Working Group |
HPS - WG 1249 - HPS - Computer Based Controls for Hydroelectric Power Plant Automation Working Group
|
Working Group Chair |
James Volk
|
Standards Committee | |
Society | |
IEEE Program Manager | |
Existing Standards |
This guide addresses the application, design concepts, and implementation of computer-based control systems for hydroelectric plant automation. It addresses functional capabilities, performance requirements, interface requirements, hardware considerations, and operator training. It includes recommendations for system testing and acceptance. The electrical protective system (generator and step-up transformer) is beyond the scope of this guide.
|