Project Details
This standard applies to applies to use of bushings as components of liquid immersed transformers and liquid immersed reactors.
This standard does not apply to the following:
- High-voltage cable terminations (potheads)
- Bushings for circuit breakers
- Bushings for instrument transformers including station service voltage transformers
- Bushings for test transformers
- Bushings in which the internal insulation is provided by a gas
- Bushings applied with gaseous insulation (other than air at atmospheric pressure) external to the bushing
- Bushings for automatic circuit reclosers and line sectionalizers
- Bushings for dc applications
Standards Committee | |
PAR Approval |
2018-02-15
|
PARs |
Additional Resources Details
Historical Base Standard |
Working Group Details
Working Group |
Bushing-WGC57.19.00 - Bushing - Gen. Req. of Bushings Working Group
|
Standards Committee | |
Society | |
IEEE Program Manager | |
Existing Standards | |
Service conditions, rating, general requirements, and test procedures for outdoor apparatus bushings are set forth. They apply to outdoor power apparatus bushings that have basic impulse insulation levels of 110 kV and above for use as components of oil-filled transformers, oil-filled reactors, and oil circuit breakers. The following are not covered: high-voltage-cable terminations (potheads), bushings for instrument transformers, bushings for test transformers, bushings in which the internal insulation is provided by a gas, bushings applied with gaseous insulation (other than air at atmospheric pressure) external to the bushing, bushings for distribution-class circuit breakers and transformers, bushings for automatic circuit reclosures and line sectionalizers, and bushings for oil-less and oil-poor apparatus.
|
|
Revision of IEEE Std C57.19.00-1991 This standard applies to power apparatus bushings that have basic impulse insulation levels of 110 kV and above for use as components of oil-filled transformers and oil-filled reactors.
|