This guide covers the basics and the practice of quality acceptance and diagnostic maintenance tests of shielded insulated power cable systems rated 5 kV and above in the field. It provides instructions for the test setups, the required test voltage levels, the test procedures for simple withstand (with no Partial Discharge [PD] monitoring) and PD monitored withstand as well as guidance for the evaluation of test data.