This standard applies to large-scale photovoltaic (PV) power plants with an installed peak capacity exceeding 500 MW and connected to the grid at voltage levels of 110 kV or higher. This standard specifies requirements for the architecture, functions, data acquisition and communication, active power-frequency support control, reactive power-voltage support control, wide-band oscillation suppression, blocking functions, and performance testing of active support and control systems for such power plants. Other types of power plants may refer to this standard for guidance
- Standard Committee
- PHO/SC - Standards Committee
- Status
- Active PAR
- PAR Approval
- 2026-11-04
Working Group Details
- Society
- Society
- IEEE Photonics Society
- Standard Committee
- PHO/SC - Standards Committee
- Working Group
-
ASPPP - Active support and control systems of large photovoltaic power plants
- IEEE Program Manager
- Christian Orlando
Contact Christian Orlando - Working Group Chair
- Chao Zhang
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards
