This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.
- Sponsor Committee
- PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors - Status
- Inactive-Reserved Standard
- PAR Approval
- 2000-01-30
- Superseded by
- 400.3-2022
- Board Approval
- 2006-09-15
- History
-
- ANSI Approved:
- 2007-02-01
- Published:
- 2007-02-05
- Inactivated Date:
- 2021-03-25
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society - Sponsor Committee
- PE/IC - Insulated Conductors
Learn More About PE/IC - Insulated Conductors - Working Group
-
ADMIN_8204 - Project Administration_8204
- IEEE Program Manager
- Dalisa Gonzalez
Contact Dalisa Gonzalez
Other Activities From This Working Group
Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.
No Active Projects
Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.
No Active Standards
These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.
No Superseded Standards
These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.
No Inactive-Withdrawn Standards
These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.
No Inactive-Reserved Standards