Withdrawn PAR

IEEE P3001.9

Recommended Practice for the Lighting of Industrial and Commercial Facilities

This recommended practice covers the lighting of industrial and commercial facilities. It covers various factors and considerations that relate to lighting, and it describes application techniques and controls that save energy and costs.

Sponsor Committee
IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
Status
Withdrawn PAR
PAR Approval
2008-06-12

Working Group Details

Society
IEEE Industry Applications Society
Learn More
Sponsor Committee
IAS/ICPS/SDC - Industrial & Commercial Power Systems Standards Development Committee
Working Group
3001.3 WG - Recommended Practice for the Design of Industrial and Commercial Power Systems: Voltage Considerations
Learn More
IEEE Program Manager
Ron Hotchkiss
Contact
Working Group Chair
Gary Fox

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P3001.3

Recommended Practice for the Design of Industrial and Commercial Power Systems: Voltage Considerations

This recommended practice contains system voltage nomenclature and the preferred voltage ratings of distribution apparatus and utilization equipment. This is essential for proper voltage identification throughout a power distribution system. The recommended practice also discusses the dynamic characteristics of the system and the proper principles of voltage control applied so that satisfactory voltages are supplied to utilization equipment under operating conditions.

Learn More

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


No Superseded Standards

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.