Active Standard

IEEE 1527-2018

IEEE Recommended Practice for the Design of Buswork Located in Seismically Active Areas

Recommended practices for the engineering and design of flexible and rigid bus connections for bus and equipment in electric power substations located in seismically active areas are provided in this document.

Sponsor Committee
PE/SUB - Substations
Learn More About PE/SUB - Substations
Status
Active Standard
PAR Approval
2010-09-30
Superseding
1527-2006
Board Approval
2018-03-08
History
Published:
2018-08-10

Working Group Details

Society
IEEE Power and Energy Society
Learn More About IEEE Power and Energy Society
Sponsor Committee
PE/SUB - Substations
Learn More About PE/SUB - Substations
Working Group
WGD6 - WGD6 - Design of Buswork Located in Seismically Active Areas
IEEE Program Manager
Patricia Roder
Contact Patricia Roder
Working Group Chair
Michael Riley

Other Activities From This Working Group

Current projects that have been authorized by the IEEE SA Standards Board to develop a standard.


P1527

Recommended Practice for Seismic Design of Substation Buswork

This document provides recommended practices for the engineering and design of flexible and rigid bus connections for bus and equipment in electric power substations located in seismically active areas. It covers the effects of buswork connections in the seismic qualification of equipment covered within the scope of IEEE Std 693(TM).

Learn More About P1527

Standards approved by the IEEE SA Standards Board that are within the 10-year lifecycle.


No Active Standards

These standards have been replaced with a revised version of the standard, or by a compilation of the original active standard and all its existing amendments, corrigenda, and errata.


1527-2006

IEEE Recommended Practice for the Design of Flexible Buswork Located in Seismically Active Areas

The engineering and design of flexible bus connections for bus and equipment in electric power substations is described. This recommended practice gives guidance to the substation engineer who is unfamiliar with seismic considerations in the engineering and design of connections, and provides engineers with the current state of knowledge of the dynamic effects of high-voltage connections and conductors.

Learn More About 1527-2006

These standards have been removed from active status through a ballot where the standard is made inactive as a consensus decision of a balloting group.


No Inactive-Withdrawn Standards

These standards are removed from active status through an administrative process for standards that have not undergone a revision process within 10 years.


No Inactive-Reserved Standards
Subscribe to our Newsletter

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.