Project Icon

Power and Energy Projects

Power and Energy Projects
Status Help
11 - Standard for Rotating Electric Machinery for Rail and Road VehiclesThe purpose of this standard is to define ratings, tests, and calculation procedures to permit comparison among machines for similar use ... active Project
18 - Standard for Shunt Power CapacitorsThis standard applies to power capacitors rated 216 V or higher, 2.5 kvar or more, and designed for shunt connection to alternating curr ... active Project
62.2 - Guide for Diagnostic Field Testing of Electric Power Apparatus - Electrical MachineryThis guide is intended to assist maintenance personnel in determining what diagnostic tests should be planned for their rotating electri ... active Project
80 - Guide for Safety in AC Substation GroundingThe intent of this guide is to provide guidance and information pertinent to safe grounding practices in ac substation design. The speci ... active Project
81 - Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding SystemThe purpose of this guide is to present practical instrumentation methods that may be used for measuring soil resistivity, the impedance ... active Project
97 - Diagnostic Test Methods for testing the Insulation of AC Electric Machinery Using Direct VoltageProvide guidance and uniform methods for performing advanced direct voltage diagnostic tests for condition assessment of the groundwall ... active Project
115 - Guide for Test Procedures for Synchronous Machines Part I--Acceptance and Performance Testing Part II--Test Procedures and Parameter Determination for Dynamic AnalysisThis guide contains instructions for conducting generally applicable and accepted tests to determine the performance characteristics of ... active Project
125 - Recommended Practice for Preparation of Equipment Specifications for Speed-Governing of Hydraulic Turbines Intended to Drive Electric GeneratorsThis recommended practice is intended to assist users with the preparation of procurement specifications for electric-hydraulic speed go ... active Project
336 - Recommended Practice for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear FacilitiesThe purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the pr ... active Project
382 - Standard for Qualification of Safety-Related Actuators for Nuclear Power Generating Stations and Other Nuclear FacilitiesThe purpose of this standard is to provide direction for the implementation of the requirements of IEEE Std 60780-323TM-2016 as they app ... active Project
400.1 - Guide for Field Testing of Laminated Dielectric, Shielded AC Power Cable Systems Rated 5 kV to 500 kV Using High Voltage Direct Current (HVDC)The purpose of this guide is to provide uniform practices and procedures for performing direct voltage acceptance and maintenance tests ... active Project
400.3 - Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable SystemsThis guide describes diagnostic methods capable of detecting and locating partial discharges from defects and damage in installed shield ... active Project
400.5 - Guide for Field Testing of Shielded DC Power Cable Systems Using High Voltage Direct Current (HVDC)The purpose of this guide is to provide uniform practices and procedures for performing direct voltage acceptance and maintenance tests ... active Project
421.1 - Standard Definitions for Excitation Systems for Synchronous MachinesThis standard provides a common base for terminology in common usage related to excitation control systems. The definitions given in thi ... active Project
421.5 - Recommended Practice for Excitation System Models for Power System Stability StudiesMany of those who perform power system simulations require the complete and accurate representation of the particular excitation systems ... active Project
473 - Recommended Practice for an Electromagnetic Site Survey (10 kHz to 40 GHz)The purpose of this Recommended Practice is to provide the necessary background, guidance and methodology necessary to plan an electroma ... active Project
484 - IEEE Draft Recommended Practice for Installation Design and Installation of Vented Lead-Acid Batteries for Stationary ApplicationsRecommended design practices and procedures for storage, location, mounting, ventilation, instrumentation, pre-assembly, assembly, and c ... active Project
485 - IEEE Draft Recommended Practice for Sizing Lead-Acid Batteries for Stationary ApplicationsMethods for defining the dc load and for sizing a lead-acid battery to supply that load for stationary battery applications in full-floa ... active Project
495 - Guide for Testing Faulted Circuit IndicatorsFCIs are commonly used by electric utilities to aid in service restoration. The purpose of this guide is to identify the various tests a ... active Project
510 - Guide for Electrical Safety in High-Voltage TestingThis document is meant to be a practical reference document from which supervisors, engineers, and technicians may obtain basic informat ... active Project
516 - Guide for Maintenance Methods on Energized Power LinesThe purpose of this guide is to a) Present, in one guide, sufficient details of some of the methods and equipment presently in use to en ... active Project
519 - Standard for Harmonic Control in Electric Power SystemsThis document sets the quality of power related to harmonics that is to be provided at the point of common coupling, and is not intended ... active Project
519.1 - Guide for Applying Harmonic Limits on Power SystemsThere is a need for guidelines that describe how the limits from IEEE 519-2014 can be applied in different situations. This document pr ... active Project
522 - Guide for Testing Turn Insulation of Form-Wound Stator Coils for Alternating-Current Electric MachinesThe purpose of this publication is to: (1) Define surge / impulse testing as applied to the windings of an electric machine; (2) Review ... active Project
532 - Guide for Selecting and Testing Jackets for Power, Instrumentation, and Control CablesThe guide provides cable users assistance in the selection of jackets for the purpose of optimizing cable design and performance. A seco ... active Project
563 - Guide on Conductor Self-Damping MeasurementsThis Guide provides proven methods for investigators to perform measurements of the inherent damping characteristics of conductors. It d ... active Project
572 - Standard for Qualification of Class 1E Connection Assemblies for Nuclear Power Generating Stations and Other Nuclear FacilitiesThe purpose of this standard is to provide specific direction for the implementation of IEEE Std 60780-323-2016 on qualification as it p ... active Project
592 - IEEE Draft Standard for Insulation Shields on Medium-Voltage (15 kV - 35 kV) Cable Joints and Separable ConnectorsThis standard covers design tests for shield resistance, simulated touch current and a simulated fault-current initiation for insulation ... active Project
605 - Guide for Bus Design in Air Insulated SubstationsSubstation rigid and strain bus structure design involves electrical, mechanical, and structural considerations. It is the purpose of th ... active Project
627 - Standard for Qualification of Equipment Used in Nuclear FacilitiesThe purpose of this standard is to provide basic principles and guidance to demonstrate the qualification of equipment. Qualification is ... active Project
628 - Standard Criteria for the Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits for Nuclear Power Generating StationsThe purpose of this standard is to provide criteria for the minimum requirements in the selection, design, installation, and qualificati ... active Project
634 - Standard for Cable-Penetration Fire Stop Qualification TestThe purpose of this standard is to establish type tests to assure that cable-penetration fire stops meet the required fire rating. The ... active Project
644 - Standard Procedures for Measurement of Power Frequency Electric and Magnetic Fields from AC Power LinesThe purpose of this standard is to establish uniform procedures for the measurement of electric and magnetic field levels from overhead ... active Project
656 - IEEE Draft Standard for the Measurement of Audible Noise from Overhead Transmission LinesUniform procedures are established for manual 1 and automatic measurement of audible noise from overhead transmission lines. Their purpo ... active Project
664 - Guide for Laboratory Measurement of the Power Dissipation Characteristics of Aeolian Vibration Dampers for Single ConductorsThis guide describes the current methodologies, including apparatus, procedures, and measurement accuracies, for the testing of vibratio ... active Project
665 - Guide for Generating Station GroundingGenerating station grounding designs are complicated by considerations such as physically large outdoor areas with multiple buildings an ... active Project
666 - Design Guide for Electric Power Service Systems for Generating StationsWhile this design guide applies to all types of power generating stations, it is particularly applicable to stations in which the electr ... active Project
690 - IEEE Draft Standard for the Design and Installation of Cable Systems for Class 1E Circuits in Nuclear Power Generating StationsThis standard provides direction for the design and installation of safety-related electrical cable systems, including associated circui ... active Project
693 - IEEE Draft Recommended Practice for Seismic Design of SubstationsSeismic design recommendations for substations, including qualification of different equipment types are discussed. Design recommendatio ... active Project
751 - Guide for Wood Structures Used for Overhead Electric Transmission LinesTo provide Transmission Line Designers with a design overview of wood structures used for overhead electric transmission lines. active Project
762 - Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and ProductivityThis standard is intended to aid the electric power industry in reporting and evaluating electric generating unit reliability, availabil ... active Project
824 - Standard for Series Capacitor Banks in Power SystemsThe purpose of this standard is to provide the basis for design of fixed series capacitor banks. The standard will discuss all available ... active Project
825 - Guide for Interoperability of Transactive Energy Systems with Electric Power Infrastructure (Building the Enabling Network for Distributed Energy Resources)The purpose of the standard is to provide guidance on treatment of matters in which the dominant factors are the application, design, de ... active Project
837-2014/Cor 1 - Standard for Qualifying Permanent Connections Used in Substation Grounding - Corrigendum 1: Correct EMF Current Value for 5/8 Ground RodThis standard provides direction and methods for qualifying permanent connections used for substation grounding. It particularly addres ... active Project
859 - Standard Terms for Reporting and Analyzing Outage Occurrences and Outage States of Electrical Transmission FacilitiesThis standard is intended to aid the electric power industry in reporting and analyzing outage occurrences of transmission facilities. U ... active Project
946 - IEEE Draft Recommended Practice for the Design of DC Power Systems for Stationary ApplicationsRecommended practices for the design of dc power systems for stationary applications is provided by this document. The components of the ... active Project
957 - Guide for Monitoring, Managing and Cleaning of Contaminated InsulatorsThe purpose of this guide is to present information on the equipment and the methods that can be used when monitoring, managing and clea ... active Project
977a - Guide to Installation of Foundations for Transmission Line Structures AmendmentThe purpose of this guide is to present, in one document, the construction considerations necessary for the installation of transmission ... active Project
980 - Guide for Containment and Control of Oil Spills in SubstationsContainment, control and mitigation of oil spills are a concern for owners and operators of electric supply substations. The environment ... active Project
1010 - Guide for Control of Hydroelectric Power PlantsThis guide serves as a reference document for practicing engineers in the hydroelectric industry. It documents prevailing industry pract ... active Project
1032 - Guide for Protecting Transmission Static Var CompensatorsThis guide assists users in understanding the functional requirements for implementing a modern protection system for transmission Stati ... active Project
1036 - Guide for the Application of Shunt Power CapacitorsThis guide applies to the use of 50 Hz and 60 Hz shunt power capacitors rated 2400 Vac and above, and assemblies of such capacitors. Inc ... active Project
1048a - Guide for Protective Grounding of Power Lines Amendment to Guide for Protective Grounding of Power LinesThis guide suggests several practices, technical information, and safety criteria for temporary protective grounding of power lines duri ... active Project
1050 - Guide for Instrumentation and Control Equipment Grounding in Generating StationsThe typical environment in a generating station provides many sources of electrical noise such as the switching of large inductive loads ... active Project
1052 - Guide for the Functional Specifications for Transmission Static Synchronous Compensator (STATCOM) SystemsThis guide presents technical information that may be used as the basis of functional specifications for Static Synchronous Compensator ... active Project
1071 - IEEE Draft Application Guide for an Engineered Restoration Program for Failed Transmission StructuresThis document identifies key elements for implementing a program for temporary transmission line restoration structures in a safe, effic ... active Project
1110 - Guide for Synchronous Generator Modeling Practices and Parameter Verification with Applications in Power System Stability AnalysesThe modeling of synchronous machines for stability studies and analyses is subject to continuing review and possible improvements. The ... active Project
1120 - Guide for the Planning, Design, Installation, and Repair of Submarine Power Cable SystemsThe existing guide is an outline of factors to be consider, with few explanatory notes. It assumes the user is knowledgeable on the top ... active Project
1127 - Guide for the Design, Construction, and Operation of Electric Power Substations for Community Acceptance and Environmental CompatibilityThis guide provides guidance on community acceptance and environmental compatibility for new substations or substation expansions. active Project
1138 - Standard for Testing and Performance for Optical Ground Wire (OPGW) for Use on Electric Utility Power LinesThis standard covers the construction, mechanical and electrical performance, acceptance criteria, and test requirements for overhead gr ... active Project
1147 - Guide for the Rehabilitation of Hydroelectric Power PlantsThis guide is directed to the practicing engineer in the field of hydroelectric power for the purpose of providing guidance in the decis ... active Project
1159 - Recommended Practice for Monitoring Electric Power QualityThis recommended practice provides users with a consistent set of terms and definitions for describing power quality phenomena. An under ... active Project
1159.3 - Recommended Practice for Power Quality Data Interchange Format (PQDIF)IEEE 1159.3 provides the power quality industry with the specification for PQDIF, which is an open and accepted data format standard for ... active Project
1185 - Recommended Practice for Cable Installation in Generating Stations and Industrial FacilitiesThe purpose of this recommended practice is to provide guidance on how to prevent installation damage which is the single greatest cause ... active Project
1186 - Recommended Practice for Applicability of Methods for the Evaluation of Low Voltage and Medium Voltage Installed Cable Systems in Nuclear FacilitiesThe purpose of this document is to provide guidance when applying test methods to detect and quantify degradation, manufacturing defects ... active Project
1202 - Standard for Testing Flame-Propagation and Smoke Generation of Cable or Splices/ConnectorsThe purpose of this standard is to establish test protocols and performance criteria to determine the flame propagation tendency and opt ... active Project
1210 - Standard Tests for Determining Compatibility of Cable-Pulling Lubricants With Wire and CableThis standard describes tests for determining the compatibility of cable-pulling lubricants with cable jacket or other exterior cable co ... active Project
1218 - Trial-Use Guide for Maintenance of Wood Transmission and Distribution Line StructuresThe purpose of this guide is to: Present in one guide sufficient details illustrating the methods, materials and equipment presently in ... active Project
1234 - Guide for Fault Locating Techniques on Shielded Power Cable SystemsThis guide is intended to provide troubleshooting and testing personnel with guidance to safely and quickly localize a faulted cable sec ... active Project
1240 - Guide for the Evaluation of the Reliability of HVDC Converter StationsThe purpose of this guide is to help improve the reliability of HVDC converter stations through prudent application of RAM concepts to a ... active Project
1243 - Guide for Improving the Lightning Performance of Transmission LinesThis Guide assists engineers with understanding lightning impacts on electric power transmission lines and with applying methods to redu ... active Project
1248 - Guide for the Commissioning of Electrical Systems in Hydroelectric Power PlantsThis guide is directed to hydroelectric plant owners, operators, designers and contractors involved in the commissioning of electrical e ... active Project
1250 - IEEE Draft Guide for Identifying and Improving Power Quality in Power SystemsThe use of some electrical equipment attached to typical power systems creates power quality concerns. There is an increasing awareness ... active Project
1260 - Guide on the Prediction, Measurement, and Analysis of AM Broadcast Reradiation by Power LinesAn AM broadcast array is carefully constructed to radiate strongly towards listeners and weakly in directions where interference to othe ... active Project
1267 - IEEE Draft Guide for Development of Specification for Turnkey Substation ProjectsThe scope of this guide is to provide systematic methodology, guidelines and practices for developing turnkey substation specifications. ... active Project
1276 - Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Distribution, Power and Regulating TransformersThe purpose of this guide is to provide an informative technical background for the design, testing, and application of high-temperature ... active Project
1277 - Standard General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors and for Dry-Type Converter Reactors for DC Power TransmissionThe purpose of this standard is to provide those in the HVDC industry, manufacturers and "end users", a document that defines and specif ... active Project
1307 - IEEE Draft Standard for Fall Protection for Utility WorkGeneral recommendations for fall protection and rescue are provided. Sufficient details of the methods, equipment, and training requirem ... active Project
1368 - Guide for Aeolian Vibration Field Measurements of Overhead ConductorsThe measurement of Aeolian vibration of overhead conductors is currently being carried out by use of a variety of devices and methods. T ... active Project
1378 - Guide for Commissioning High-Voltage Direct-Current (HVDC) Converter Stations and Associated Transmission SystemsThe purpose of this guide is to provide guidance and assistance for developing an appropriate commissioning test plan for HVDC converter ... active Project
1402 - Guide for Physical Security of Electric Power SubstationsThe purpose of this document is to define sound engineering practices for substation physical protection that could be applied to mitiga ... active Project
1406 - Guide for the Use of Gas-in-Fluid Analysis for Paper and Laminated Paper-Polypropylene Insulated Cable SystemsThis guide is intended to provide users of pipe-type cable systems, both high-pressure fluid-filled (HPFF) and high-pressure gas-filled ... active Project
1407 - Guide for Accelerated Aging Tests for 5 kV to 46 kV Extruded Electric Power Cables Using Water-Filled TanksThe purpose of this guide is to provide users of accelerated aging tests and the resultant data with detailed insight into important tes ... active Project
1427 - Guide for Recommended Electrical Clearances and Insulation Levels in Air Insulated Electrical Power SubstationsProper electrical clearances are necessary for the design, construction, and operation of electric supply substations. This document dev ... active Project
1453 - Voltage FluctuationsFlicker Standard for the Analysis of Fluctuating Power Installations on Power SystemsThe purpose of this document is to provide definitive guidance to system operators, owners, and engineers who are responsible for provid ... active Project
1484.21 - Task Model for Project-based LearningThe TMPL standard allows multiple applications to develop and share consistent data about project-based learning opportunities. active Project
1493 - Guide for the Evaluation of Solvents Used for Cleaning Electrical Cables and AccessoriesThis guide provides test methods and acceptance criteria for critical properties which determine the acceptability of a solvent for clea ... active Project
1523 - Guide for the Application, Maintenance, and Evaluation of Room Temperature Vulcanizing (RTV) Silicone Rubber Coatings for Outdoor Ceramic InsulatorsThis revision of the guide incorporates the new knowledge obtained over 15 years of new experience on the application, maintenance, and ... active Project
1527 - IEEE Draft Recommended Practice for the Design of Buswork Located in Seismically Active AreasThis document provides recommended practices to give guidance to the substation engineer regarding seismic considerations in the enginee ... active Project
1531 - Guide for Application and Specification of Harmonic FiltersNo specific standard exists for harmonic filters, although standards do exist for virtually all of the components that are used in a fil ... active Project
1542 - Guide for Installation, Maintenance, and Operation of Irrigation Equipment Located Near or Under Power LinesThe guide is intended for designers, installers, and operators of the irrigation equipment, as well as electric power utilities whose li ... active Project
1547 - IEEE Draft Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems InterfacesThe technical specifications for, and testing of, the interconnection between utility electric power systems (EPS) and distributed energ ... active Project
1553 - Standard for Voltage Endurance Testing of Form-Wound Coils and Bars for HydrogeneratorsThe purpose of this standard is to define the test parameters for the voltage-endurance test and the number of specimens to be used for ... active Project
1578 - Recommended Practice for Stationary Battery Electrolyte Spill Containment and ManagementDescriptions of products, methods, and procedures relating to stationary batteries, battery electrolyte spill mechanisms, electrolyte co ... active Project
1584 - IEEE Draft Guide for Performing Arc-Flash Hazard CalculationsThis guide provides mathematical models for designers and facility operators to apply in determining the arc-flash hazard distance and t ... active Project
1591.3 - Standard for Qualifying Hardware for Helically-Applied Fiber Optic Cable Systems (WRAP Cable)The purpose of this standard is to establish performance and testing specifications for hardware used on WRAP cable systems in order to ... active Project
1594 - Standard for Helically Applied Fiber Optic Cable Systems (WRAP Cable) for Use on Overhead Utility LinesOther existing standards do not cover all-dielectric fiber optic (WRAP) cable designed to be helically wrapped around a conductor or oth ... active Project
1595 - Standard for Testing and Performance for Optical Phase Conductor (OPPC) for Use on Electrical Utility Power LinesThis standard covers the construction, mechanical and electrical performance, acceptance criteria, and test requirements for overhead op ... active Project
1613 - Standard for Environmental and Testing Requirements for Intelligent Electronic Devices (IEDs) Installed in Transmission and Distribution FacilitiesThe purpose of this standard is to define the environmental conditions present in transmission and distribution facilities and to establ ... active Project
1613-2009/Cor 1 - Standard Environmental and Testing Requirements for Communications Networking Devices Installed in Electric Power Substations - Corrigendum 1: Corrected definition of "communications port"This document specifies standard service conditions, standard ratings, environmental performance requirements, and testing requirements ... active Project
1613.1 - Standard Environmental and Electromagnetic Compatibility (EMC) Testing Requirements for Intelligent Electronic Devices (IEDs) Installed in Transmission and Distribution FacilitiesThis standard establishes the electromagnetic compatibility (EMC) testing requirements for all devices or systems utilizing analog and/o ... active Project
1614 - Field-Testing of Shielded Power Cable Systems Rated 5 kV and Above with Continuous Alternating VoltageThe purpose of this guide is to provide general instructions and test parameters, including voltage level and duration, for field tests ... active Project
1615 - IEEE Draft Recommended Practice for Network Communication in Electric Power SubstationsRecommended practices for communication and interoperation of devices connected on an electric power substation Internet protocol (IP) n ... active Project
1617 - Guide for Assessment, Mitigation, and Control of Corrosion of Metallic Shields in Extruded Dielectric Cables rated 5 kV to 46 kVThe purpose of this document is to provide guidance for the assessment, mitigation, and control of corrosion in metallic shield wires, s ... active Project
1635 - IEEE/ASHRAE Draft Guide for the Ventilation and Thermal Management of Batteries for Stationary ApplicationsVented lead-acid (VLA), valve-regulated lead-acid (VRLA), and nickel-cadmium (NiCd) stationary battery installations are discussed in th ... active Project
1637 - Guide for Selecting and Applying Terminations for Shielded Alternating-Current Power Cable Rated 5 kV - 46 kVThe purpose of this project is to guide the reader in selecting and applying terminations for shielded-power cable 5 kV - 46 kV. active Project
1646 - Standard Communication Delivery Time Performance Requirements for Electric Power Substation AutomationUitilities will use communication performance requirements as part of a procurement specification to develop new substation automation s ... active Project
1654 - Guide for RF Protection of Personnel Working in the Vicinity of Wireless Communications Antennas Attached to Electric Power Line StructuresElectric utilities are required to meet the requirements established by applicable regulations [e.g., Occupational Safety and Health Adm ... active Project
1657 - IEEE Draft Recommended Practice for Personnel Qualifications for Installation and Maintenance of Stationary BatteriesThis recommended practice defines the areas of recommended knowledge for installers and maintainers of stationary batteries and related ... active Project
1665 - Guide for the Rewind of Synchronous Generators, 50 Hz and 60 Hz, Rated 1 MVA and AboveThis guide will provide the generator Owner with insight into the considerations that are necessary when rewinding or refurbishing a gen ... active Project
1667 - Standard for Discovery, Authentication, and Authorization in Host Attachments of Storage DevicesThis standard defines discovery, authentication, and authorization protocols between hosts and storage devices over multiple transports. active Project
1687.1 - Standard for the Application of Interfaces and Controllers to Access 1687 IJTAG Networks Embedded Within Semiconductor DevicesThis standard enables users of the IEEE 1687-2014 Internal-JTAG "Standard for Access and Control of Instrumentation Embedded within a Se ... active Project
1711 - Standard for a Cryptographic Protocol for EPS Serial LinksThe elevated concern of cyber security throughout the power industry has created a need to protect communications to and from substation ... active Project
1711.1 - Standard for a Cryptographic Protocol for Cyber Security of Substation Serial Links: Substation Serial Protection ProtocolThe elevated concern of cyber security throughout the power industry has created a need to protect communications in the EPS. This stand ... active Project
1711.2 - Standard for Secure SCADA Communications Protocol (SSCP)This standard defines the Secure SCADA Communications Protocol (SSCP), a cryptographic protocol to provide integrity, and optional confi ... active Project
1719 - Guide for Evaluating Stator Cores of AC Electric Machines Rated 1 MVA and HigherThe purpose of this guide is to provide assistance to engineering and maintenance personnel responsible for planning, performing, and as ... active Project
1776 - Recommended Practice for Thermal Evaluation of Unsealed or Sealed Insulation Systems for AC Electric Machinery Employing Form-Wound Pre-Insulated Stator Coils for Machines Rated 15 000 V and BelowThe purpose of this procedure is to classify unsealed or sealed insulation systems for the machinery used inusual (normal) service or ma ... active Project
1806 - Guide for Reliability Based Placement of Overhead and Underground Switching and Overcurrent Protection Equipment Up to and Including 38 kVThis guide provides means and methodologies for proper placement of switches and protective devices to achieve the desired performance c ... active Project
1812 - Guide for Testing Permanent Magnet MachinesInstructions for conducting tests to determine the performance characteristics of permanent magnet machines are covered in this guide. A ... active Project
1815 - Standard for Electric Power Systems Communications-Distributed Network Protocol (DNP3)The purpose of this standard is to document and make available the specifications for the DNP3 protocol. While a primary focus of this p ... active Project
1820 - Guide on the Selection of Transmission and Distribution Insulators with Respect to Cold Weather ConditionsThe purpose of this guide is to provide methods to characterize the pollution and icing environment of a location or region and then to ... active Project
1854 - IEEE Draft Guide for Smart Distribution Applications GuideThis guide categorizes important smart distribution applications, develops descriptions of the critical functions involved, defines impo ... active Project
1857.8 - Standard for 2nd Generation Audio CodingThis standard is the second generation of IEEE std 1857.2-2013 [IEEE Standard for Advanced Audio Coding], which provides more flexible a ... active Project
1870 - Guide for the Parameter Measurement of AC Transmission LinesThe accurate parameter of power transmission line is the basis of precise power flow calculations, stability analysis, protective settin ... active Project
1876 - Standard for Networked Smart Learning for Online LaboratoriesTo ease the design and implementation of pedagogically driven remote laboratory experiments and its learning environments. active Project
1879 - Trial Use Guide for Extending the Life of Power Cables in the FieldTo educate potential users in the technology of rejuvination so that they can make decisions concerning the application of the technolo ... active Project
1882 - IEEE Draft Guide for Establishing, Benchmarking, and Maintaining a Working Program for Energized Transmission LinesThis guide describes the necessary elements for developing a live working program on AC transmission systems. active Project
1885 - Guide for Assessing, Measuring and Verifying Volt-Var Control Optimization on Distribution SystemsThis guide provides methods to estimate the potential benefits (e.g., energy savings, demand reduction and loss reduction) that can be a ... active Project
1889 - Guide for Evaluating and Testing the Electrical Performance of Energy Saving DevicesIt is the purpose of this guide to provide instructions for the measurement protocol of all the electrical quantities that are needed in ... active Project
1891 - Standard Criteria for Application of Intelligent Digital Devices to Nuclear Power Generating StationsThis standard provides criteria and guidance for the use of intelligent digital devices/components in nuclear generating station applica ... active Project
1901.1 - IEEE Draft Standard for Medium Frequency (less than 15 MHz) Power Line Communications for Smart Grid ApplicationsThis Standard specifies Physical (PHY) and Media Access Control (MAC) layers of the medium frequency band (less than 12 MHz) broadband p ... active Project
1914.3 - Standard for Radio Over Ethernet Encapsulations and MappingsThis standard enables the transfer of In-phase Quadrature (IQ) user-plane data, vendor specific data, and control and management (C&M) i ... active Project
1924.1 - Recommended practice for developing energy efficient power-proportional digital architecturesThe purpose of this practice is to provide a set of guidelines for the designers and developers of digital architectures that ensures th ... active Project
2030.5 - IEEE Draft Standard for Smart Energy Profile Application ProtocolThe 'APPLICATION' layer with TCP/IP providing functions in the 'TRANSPORT' and 'INTERNET' layers is defined in this standard. Depending ... active Project
2030.8 - IEEE Draft Standard for the Testing of Microgrid ControllersA key element of microgrid operation is the microgrid controller and more specifically the energy management system. It includes the con ... active Project
2030.10 - Standard for DC Microgrids for Rural and Remote Electricity Access ApplicationsThe purpose of this standard is to address the needs of the electrical power industry to provide safe and economic access to electricity ... active Project
2030.101 - IEEE Draft Guide for Designing a Time Synchronization System for Power SubstationsThis guide practice covers the design, installation and monitoring of time synchronization systems in power utility substations. This in ... active Project
2030.102.1 - Standard for Interoperability of Internet Protocol Security (IPsec) Utilized within Utility Control SystemsThe purpose of this document is to define specific configuration profiles of the Internet Protocol Security (IPsec) protocol suite suita ... active Project
2048.3 - Standard for Virtual Reality and Augmented Reality: Immersive Video File and Stream FormatsThis standard specifies the formats of immersive video files and streams, and the functions and interactions enabled by the formats. active Project
2048.4 - Standard for Virtual Reality and Augmented Reality: Person IdentityThe standard specifies the requirements and methods for verifying a person's identify in virtual reality. active Project
2411 - Human Factors Engineering Guide for the Validation of System Designs and Integrated Systems Operations at Nuclear FacilitiesThe project will provide guidance to be used by nuclear facility designers, applicants, licensees, architect/engineers and regulators to ... active Project
2412 - Standard Test for Determining Circuit Integrity Performance of Fire Resistive Cable Systems in Passenger Rail and Road TunnelsThe purpose of the document is to provide circuit integrity test methodology and performance requirements for cables systems which may ... active Project
2417 - Guide to Smoke, Fire and Explosions in Underground Electrical StructuresFailures of underground cables and accessories can result in the release of toxic gases and large amounts of energy. The guide examines ... active Project
2420 - Standard Criteria for Combustion Turbine Generator Units Applied as Standby Power Supplies for Nuclear Power Generating StationsThe purpose of this standard is to provide principal design criteria, design features, testing, and qualification requirements for combu ... active Project
2421 - Guide for Designing and Developing Computer-Based Displays for Monitoring and Control of Nuclear FacilitiesThis document leverages knowledge gained from recent industry experience developing CBDs to provide detailed guidance for applying the g ... active Project
2425 - Standard for Electromagnetic Compatibility Testing of Electrical and Instrumentation and Control Equipment at Nuclear Power Generating Stations and Other Nuclear FacilitiesThe purpose of the standard is to provide qualification methods and criteria for establishing EMC of electrical and I&C equipment used i ... active Project
2426 - Guide for Field Measurement of Fast-Front and Very Fast-Front Overvoltages in Electric Power SystemThis guide provides a practical reference document which supervisors, engineers, technicians and researchers may reference for guidance ... active Project
2460 - Nuclear Facilities - Instrumentation Important To Safety - Spent Fuel Pool InstrumentationThe purpose of this standard is to establish design, performance, qualification, and display criteria for spent fuel pool instrumentatio ... active Project
2465 - Recommended Practice for Pulse-Type Partial Discharge Measurements on Individual Stator Coils and BarsThe purposes of this recommended practice are as follows: a) To provide a uniform procedure for pulse-type partial discharge measurement ... active Project
2655 - Atmospheric Inspection & AssessmentPurpose--The purpose of this standard is to provide procedures for the use of common inspection practices and technology on structures a ... active Project
2656 - Guide for Functional Specification of Voltage-Sourced Converter for HVDC StationsThis guide presents technical information that may be used as the basis of functional specifications for VSC HVDC Converter Stations. Th ... active Project
2685 - Recommended Practice for Energy Storage for Stationary Engine-Starting SystemsFailure of engine-driven generators to start is a major cause of data-center and other system outages. This document addresses the energ ... active Project
2740 - Guide for the Selection and Installation of Flexible Electrical Cables and Systems in Hazardous (Classified) Locations on Land Drilling RigsThis guide will address gaps in cable system selection, performance and installation of cables and cable systems for Hazardous (Classifi ... active Project
2760 - Guide for Wind Power Plant Collector System Design for Personnel SafetyThe intent of this guide is to provide guidance and information pertinent to the grounding practices in wind power plant collector syste ... active Project
2771 - Guide for Parameter Configuration of Arcing Horns of DC Earth Electrode LinesThis guide indicates the dimension, installed position, gap distance of arcing horns of earth electrode lines, and provides a uniform cr ... active Project
2775 - Technical Guide for Smart Hydroelectric Power PlantTraditional hydroelectric power plant automation and information systems lack an integrated standard for guidance, which can lead to red ... active Project
2776 - Guide for Specifying and Selecting Cables for Nuclear FacilitiesThe purpose of this guide is to provide the user with cable designs and applications that are common in the nuclear industry. It is int ... active Project
2778 - Guide for Solar Power Plant Grounding for Personnel ProtectionThe intent of this guide is to provide guidance and information pertinent to the grounding practices in solar power plants for personnel ... active Project
3002.2 - IEEE Draft Recommended Practice for Conducting Load-Flow Studies of Industrial and Commercial Power SystemsThis recommended practice addresses activities related to load flow analysis, including design considerations for new systems, analytica ... active Project
3002.3 - IEEE Draft Recommended Practice for Conducting Short-Circuit Studies of Industrial and Commercial Power SystemsThis recommended practice addresses activities related to short-circuit analysis, including design considerations for new systems, analy ... active Project
3002.7 - IEEE Recommended Practice for Conducting Motor-Starting Studies in Industrial and Commercial Power SystemsThis recommended practice describes how to conduct motor-starting studies including design considerations for new systems, analytical st ... active Project
3002.8 - IEEE Draft Recommended Practice for Conducting Harmonic-Analysis Studies of Industrial and Commercial Power SystemsThis recommended practice describes how to conduct harmonic analysis studies of industrial and commercial power systems. The following d ... active Project
3003.1 - IEEE Draft Recommended Practice for the System Grounding of Industrial and Commercial Power SystemsThis recommended practice covers the system grounding of industrial and commercial power systems. It is likely to be of greatest value t ... active Project
3004.3 - IEEE Draft Recommended Practice for the Application of Low-Voltage Fuses in Industrial and Commercial Power SystemsIEEE’s Industrial Applications Society has determined a need for reorganizing the IEEE’s Color Books Series, 13 books that currently ... active Project
3004.11 - IEEE Draft Recommended Practice for Bus and Switchgear Protection in Industrial and Commercial Power SystemsIEEE’s Industrial Applications Society has determined a need for reorganizing the IEEE’s Color Books Series, 13 books that currently ... active Project
60076-16 - IEC/IEEE International Draft Standard - Power Transformers - Part 16: Transformers for Wind Turbine ApplicationThis part of IEC 60076 applies to dry-type and liquid-immersed transformers for wind turbine step-up application having a winding with h ... active Project
60214-1-57-131 - Standard Requirements for Tap ChangersThis part of IEC 60214 applies to on-load tap-changers of both resistor and reactor types, deenergized tap-changers, and their motor-dri ... active Project
60214-2 - IEEE Draft Standard for Tap-Changers - Part 2: Application GuideThis part of IEC 60214 is intended to assist in the selection of tap-changers designed in accordance with IEC 60214-1 or IEEE Std. C57.1 ... active Project
60255-118-1 - IEEE/IEC Draft International Standard - Measuring relays and protection equipment - Part 118-1: Synchrophasor for power system - MeasurementsThis standard provides continuation and further development of previous synchrophasor standards, notably the IEEE C37.118 series. It def ... active Project
62271-37-013 - IEEE/IEC International Standard for High-Voltage Switchgear and Controlgear -- Part 37-013: Alternating-Current Generator Circuit-BreakersThis part of IEC 62271 is applicable to three-phase a.c. high-voltage generator circuit-breakers, hereafter called generator circuit-bre ... active Project
80005-1 - ISO/IEC/IEEE Draft International Standard - Utility Connections in Port--Part 1: High Voltage Shore Connection (HVSC) Systems--General requirementsThis part of IEC 80005 describes high voltage shore connection (HVSC) systems, on board the ship and on shore, to supply the ship with e ... active Project
80005-3 - IEC/IEEE Draft International Standard - Utility Connections in Port - Part 3: Low Voltage Shore Connection (LVSC) Systems - General RequirementsThis part of IEC/IEEE 80005 describes low voltage shore connection (LVSC) systems, on board the ship and on shore, to supply the ship wi ... active Project
C37.1.2 - Recommended Practice for Databases Used in Utility Automation SystemsThis recommended practice presents general requirements, design, and lifecycle costs versus performance for databases associated with su ... active Project
C37.2 - Standard Electrical Power System Device Function Numbers, Acronyms, and Contact DesignationsA device function number, with an appropriate prefix and appended suffix (or an acronym), is used to identify the function(s) of each de ... active Project
C37.04 - IEEE Draft Standard for Ratings and Requirements for AC High Voltage Circuit Breakers with Rated Maximum Voltage above 1000 V This standard covers the rating structure for all high-voltage circuit breakers, which include all voltage ratings above 1000 V ac and ... active Project
C37.09 - IEEE Draft Standard Test Procedures for AC High-Voltage Circuit Breakers with Rated Maximum Voltage above 1000VThe testing procedures for all high-voltage circuit breakers that include voltage ratings above 1000 V ac and comprise both indoor and o ... active Project
C37.10.1 - IEEE Draft Guide for the Selection of Monitoring for Circuit BreakersDirection is provided for the selection of monitoring and for diagnostic parameters to be used with high-voltage circuit breakers (i.e., ... active Project
C37.011 - IEEE Draft Guide for the Application of Transient Recovery Voltage for AC High-Voltage Circuit Breakers with Rated Maximum Voltage above 1000 VThis application guide covers procedures and calculations necessary to apply the standard transient recovery voltage (TRV) ratings for a ... active Project
C37.12 - IEEE Draft Guide for Specifications of High-Voltage Circuit Breakers (Over 1000 Volts)These specifications apply to all indoor and outdoor types of ac high-voltage circuit breakers rated above 1000 volts. This document is ... active Project
C37.12.1 - IEEE Draft Recommended Practice for Instruction Manual Content of High-Voltage Circuit Breakers (Over 1000 Volts)This guide provides a recommended table of contents for high-voltage circuit breaker instruction manuals. The guide provides a listing o ... active Project
C37.012a - Guide for the Application of Capacitance Current Switching for AC High-Voltage Circuit Breakers Above 1000 V Amendment Changing the Capacitive Inrush/Outrush Limitations of SwitchgearThis guide is intended for general use in the application of circuit breakers for capacitance current switching. Familiarity with other ... active Project
C37.016 - Standard for AC High Voltage Circuit Switchers rated 15.5 kV through 245 kVThis standard is applicable to ac circuit switchers designed for outdoor installation and for rated power frequencies of 50 Hz and 60 Hz ... active Project
C37.20.9 - IEEE Draft Standard for Metal-Enclosed Switchgear Rated 1 kV to 52 kV Incorporating Gas Insulating SystemsThis standard covers metal-enclosed switchgear assemblies incorporating gas insulating systems containing, but not limited to, such devi ... active Project
C37.30.1 - Standard Requirements for AC High-Voltage Air Switches Rated Above 1000 VThe purpose of this standard is to provide a basic standard for air switches. active Project
C37.30.3 - IEEE Draft Standard Requirements for High Voltage Interrupter Switches, Interrupters or Interrupting Aids used on or attached to Switches Rated for Alternating Currents above 1000 VoltsThis standard covers requirements for Interrupter Switches, Interrupters or Interrupting Aids Used on or Attached to Switches Rated for ... active Project
C37.30.5 - IEEE Draft Standard for Definitions for AC High-Voltage Air Switches Rated Above 1000 VThe definitions of terms and explanatory notes relating thereto contained in this standard are intended for the sole purpose of establis ... active Project
C37.48 - Guide and Tutorial for the Application of High-Voltage (> 1000 V) Fuses and Accessoriesa) To help prospective users and protection engineers understand the basics of high-voltage (> 1000 V a.c.) fuse technology and applicat ... active Project
C37.59 - IEEE Draft Standard Requirements for Conversion of Power Switchgear EquipmentDirections and requirements are provided 37 for the conversion of qualified power switchgear equipment. Examples such as low-voltage pow ... active Project
C37.60/62271-111 - IEC/IEEE Draft International Standard - High-voltage switchgear and controlgear - Part 111: Automatic circuit reclosers for alternating current systems up to and including 38 kVThis standard is to be read in conjunction with IEC 62271-1:20xx17, to which it refers and which is applicable unless otherwise specifie ... active Project
C37.62 - Standard for Pad Mounted, Dry Vault, Submersible Fault, and Overhead Fault Interrupters for alternating current systems up to 38 kVThe purpose of this standard is to define the rating structure, preferred ratings, test, and construction requirements for pad mounted, ... active Project
C37.66 - Standard Requirements for Capacitor Switches for AC Systems (1 kV to 38 kV)This standard provides comprehensive and detailed requirements for designing and building switches whose specific operating duty is to r ... active Project
C37.75 - Standard for Pad-Mounted, Pole-Mounted and Submersible Switchgear Enclosures and Associated Control Enclosures - Coastal and Non-Coastal Environmental IntegrityThe purpose of this standard is to describe the requirements for a comprehensive integrity system for enclosures of pad-mounted, pole-mo ... active Project
C37.91 - Guide for Protecting Power TransformersThe purpose of this guide is to provide protection engineers with information that helps them to properly apply relays and other devices ... active Project
C37.100.1 - IEEE Draft Standard of Common Requirements for High Voltage Power Switchgear Rated Above 1000 VCommon requirements that may apply to many IEEE power switchgear standards are collected in this standard. These requirements include se ... active Project
C37.100.2 - IEEE Draft Standard for Common Requirements for Testing of AC Capacitance Current Switching Devices over 1000VThis standard provides common requirements for testing of AC Capacitive current switching devices with rated maximum voltage above 1000V. active Project
C37.100.5 - IEEE Draft Standard for Definitions of High Voltage Circuit Breakers Above 1000 Vac and 3200 Vdc, and Reclosers and Other Distribution Equipment from 1000 Vac to 38,000 VacThe terms and definitions in the standard are intended to encompass the products within the scope of the C37 series of power switchgear ... active Project
C37.101 - Guide for Generator Ground ProtectionThis guide summarizes the design and application of protective schemes to assist the reader in selecting appropriate equipment and prote ... active Project
C37.102 - Guide for AC Generator ProtectionThis Guide summarizes the use of relays and devices such that the reader may select the necessary equipment to provide adequate protecti ... active Project
C37.108 - Guide for the Protection of Secondary Network SystemsThis guide covers devices that are being used in secondary network systems protections schemes. These devices should act to sense the fa ... active Project
C37.110 - Guide for the Application of Current Transformers Used for Protective Relaying PurposesThe purpose of this guide is to present a comprehensive treatment of the theory and application of CTs to assist the relay application e ... active Project
C37.112 - IEEE Standard Inverse-Time Characteristic Equations for Overcurrent RelaysThe inverse-time characteristics of overcurrent relays are defined in this standard. Operating equations and allowances are provided in ... active Project
C37.116 - Guide for Protective Relay Application to Transmission-Line Series Capacitor BanksThe purpose of this guide is to provide the reader with ample discussion of the protection issues related to series capacitor bank desig ... active Project
C37.118.2 - Standard for Synchrophasor Data Transfer for Power SystemsThe purpose for this standard is to facilitate data exchange among measurement, data collection, and application equipment. It provides ... active Project
C37.120 - Protection System Redundancy for Power System ReliabilityA guide to provide information on protection system redundancy considerations by illustrating the purpose of redundancy and how it may b ... active Project
C37.230 - Guide for Protective Relay Applications to Distribution LinesThis guide educates and provides information on distribution protection schemes to utility engineers, consultants, educators, and manufa ... active Project
C37.233 - Guide for Power System Protection TestingThis guide is intended for power system protection professionals. It includes a reference list of type tests for protective devices as w ... active Project
C37.234 - Guide for Protective Relay Applications to Power System BusesThe purpose of the guide is to assist utility engineers and industrial and commercial plant engineers in selecting and engineering prope ... active Project
C37.235 - Guide for the Application of Rogowski Coils Used for Protective Relaying PurposesThis document provides a guide for application of Rogowski coils used for protective relaying in electric power systems. It is intended ... active Project
C37.237 - IEEE Draft Standard Requirements for Time Tags Created by Intelligent Electronic Devices - COMTAG™Common requirements for associating time tags with data items recorded or transmitted by Intelligent Electronic Devices (IEDs) are estab ... active Project
C37.242 - Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and ControlThis guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchron ... active Project
C37.245 - Guide for the Application of Protective Relaying for Phase Shifting TransformersThe purpose of this document is to provide guidance for the protection of Phase Shifting Transformers. active Project
C37.247 - Standard for Phasor Data Concentrators for Power SystemsThe purpose is to improve interoperability of devices, systems and applications that use synchrophasors and other synchronized data by s ... active Project
C37.249 - Guide for Categorizing Security Needs for Protection and Automation Related Data FilesThis guide adds granularity to security practices to precisely apply security without impeding the use or access to protection and autom ... active Project
C37.250 - Guide for Engineering, Implementation, and Management of System Integrity Protection SchemesThis Guide provides information to help properly engineer, implement and manage System Integrity Protection Schemes (SIPS). The documen ... active Project
C37.251 - Standard for Common Protection and Control Settings or Configuration Data Format (COMSET)The purpose of this standard is to provide a common format that allows settings data for protection and control functions to be exchange ... active Project
C37.301 - Standard for High-Voltage Switchgear (Above 1000 V) Test Techniques--Partial Discharge MeasurementsThis International Standard is applicable to the measurement of partial discharges which occur in electrical apparatus, components or sy ... active Project
C57.12.00 - Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating TransformersThis standard is a basis for the establishment of performance, and limited electrical and mechanical interchangeability requirements of ... active Project
C57.12.01 - Standard for General Requirements for Dry-Type Distribution and Power TransformersThis standard is intended to serve as a basis for the establishment of performance and interchangeability requirements of equipment desc ... active Project
C57.12.23 - Standard for Submersible Single-Phase Transformers: 250 kVA and Smaller; High Voltage 34 500GrdY/19 920V and Below; Low Voltage 600 V and BelowThis standard is intended for use as a basis for determining performance, interchangeability, and safety of the equipment covered, and t ... active Project
C57.12.32 - Standard for Submersible Equipment - Enclosure IntegrityThe purpose of this standard is to describe the requirements for a comprehensive enclosure integrity system for submersible equipment pr ... active Project
C57.12.38 - Standard for Pad-Mounted-Type, Self-Cooled, Single-Phase Distribution Transformers 250 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 V and Below; Low Voltage, 480/240 V and BelowThis standard is intended to define the electrical, mechanical, dimensional, performance, and interchangeability requirements of the tra ... active Project
C57.12.44 - Standard Requirements for Secondary Network ProtectorsThis standard is intended for use as a basis for establishing the performance, electrical and mechanical interchangeability, and safety ... active Project
C57.12.51 - Standard for Ventilated Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 V to 34 500 V; Low-Voltage 208Y/120 V to 4160 V- General RequirementsThis standard describes certain electrical and mechanical characteristics and takes into consideration certain safety features of 60 Hz, ... active Project
C57.12.51 - Guide for Mechanical Interchangeability of Ventilated Dry Type TransformersThis guide sets forth characteristics of ventilated dry type transformers relating to performance, limited electrical and mechanical int ... active Project
C57.12.60 - Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry-Type Power and Distribution TransformersThe purpose of this test procedure is to establish a uniform method for the following: a) Acquiring data for the selection of the temper ... active Project
C57.12.70-2011/Cor 1 - Standard Terminal Markings and Connections for Distribution and Power Transformers - Corrigendum 1: Correction of Annex AThis standard defines the terminal markings and connections for distribution, power, and regulating transformers covered in the IEEE C57 ... active Project
C57.12.80 - Standard Terminology for Power and Distribution TransformersThe purpose of this standard is to provide definitions and consistent interpretation of commonly used terminology related to electric po ... active Project
C57.12.91 - Standard Test Code for Dry-Type Distribution and Power TransformersThe purpose of this standard is to provide information regarding the procedures for the testing of dry-type transformers. Transformer re ... active Project
C57.13.5 - Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and AboveThe purpose of this standard is to supplement the IEEE Std C57.13 with specific requirements to single-phase instrument transformers of ... active Project
C57.13.7 - IEEE Draft Standard for Current Transformers with a Maximum mA Secondary Current of 250mAThe scope of C57.13-2008 does not currently address the mA range CT. This standard enables the evaluation, certification and specificati ... active Project
C57.13.8 - Standard Requirements for Station Service Voltage TransformersThis Standard is a basis for the establishment of performance and limited electrical and mechanical interchangeability requirements of t ... active Project
C57.13.9 - Standard for Power-Line Carrier Coupling Capacitors and Coupling Capacitor Voltage TransformersThis standard applies to coupling capacitors (CC) for power-line carrier (PLC) applications, to capacitors for reduction of the rate of ... active Project
C57.16 - Standard for Requirements, Terminology, and Test Code for Dry-Type Air-Core Series-Connected ReactorsThe purpose of this standard is to define the requirements and test code for series-connected dry-type aircore reactors and, with some r ... active Project
C57.18.10 - Standard Practices and Requirements for Semiconductor Power Rectifier TransformersThis standard includes transformers for semiconductor power rectifiers, inverters, furnaces and adjustable speed drives for dedicated lo ... active Project
C57.19.02 - Standard for the Design and Performance Requirements of Bushings Applied to Liquid Immersed Distribution TransformersThis standard covers electrical, mechanical, dimensional, and related requirements for non-condenser bushings used in liquid immersed di ... active Project
C57.19.04 - IEEE Draft Standard Performance Characteristics and Dimensions for High Current Power Transformer Bushings with Rated Continuous Current in Excess of 5000 Amps Located Within Bus EnclosuresThis standard covers the electrical, dimensional, and related special requirements for high current rating power transformer bushings wi ... active Project
C57.21 - Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVAThis standard specifies the requirements, terminology, and test code for oil-immersed and dry-type shunt reactors rated over 500 kVA and ... active Project
C57.32a - Standard for Requirements, Terminology, and Test Procedures for Neutral Grounding Devices Amendment: Neutral Grounding Resistor SectionThis standard applies to devices used for the purpose of controlling the ground current or the potentials to ground of an alternating cu ... active Project
C57.91 - Guide for Loading Mineral-Oil-Immersed Transformers and Step-Voltage RegulatorsApplications of loads in excess of nameplate rating involve some degree of risk. It is the purpose of this guide to identify these risks ... active Project
C57.93 - Guide for Installation and Maintenance of Liquid-Immersed Power TransformersThe recommendations presented in this guide apply to inspection, installation, and maintenance of liquid-immersed power transformers rat ... active Project
C57.104 - Guide for the Interpretation of Gases Generated in Oil-Immersed TransformersThe purpose of this document is to provide a Guide for evaluating transformer condition using analytical tools and methods involving tra ... active Project
C57.105 - Guide for Application of Transformer Connections in Three-Phase Electrical SystemsThis guide describes transformer connections and configurations in 3-phase electrical systems. The characteristics of the various transf ... active Project
C57.109 - IEEE Draft Guide for Liquid-Immersed Transformers Through-Fault-Current DurationRecommendations believed essential for the application of overcurrent protective devices applied to limit the exposure time of transform ... active Project
C57.110 - Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load CurrentsThis recommended practice provides calculation methods to conservatively evaluate the feasibility for an existing installed dry-type or ... active Project
C57.119 - IEEE Draft Recommended Practice for Performing Temperature Rise Tests on Liquid-Immersed Power Transformers at Loads Beyond Nameplate RatingsRecommendations are made, where possible, regarding the performance and evaluation of temperature rise tests on liquid-immersed power tr ... active Project
C57.123 - Guide for Transformer Loss MeasurementThe purpose of the guide is a) To describe the basis and methodology by which the accuracy requirements of (Clause 8 and Clause 9) of IE ... active Project
C57.124 - Recommended Practice for the Detection of Partial Discharge and the Measurement of Apparent Charge in Dry-Type TransformersIt is the purpose of this document to describe the wideband test method and general principles of PD measurements that are covered in IE ... active Project
C57.127 - Guide for the Detection, Location and Interpretation of Sources of Acoustic Emissions from Electrical Discharges in Power Transformers and Power ReactorsThis guide is intended to provide information that may be helpful in planning, installing, and operating acoustic measuring equipment an ... active Project
C57.142 - Guide to Describe the Occurrence and Mitigation of Switching Transients Induced by Transformers, Switching Device, and System InteractionWhen a transformer is switched into or out of a system, the transient voltage produced at the terminals of the transformer may contain s ... active Project
C57.143 - Guide for Application of Monitoring Equipment to Liquid-Immersed Transformers and ComponentsThe purpose of this document is to provide guidance to those who specify, apply, install and use on-line monitoring equipment on liquid- ... active Project
C57.147 - IEEE Draft Guide for Acceptance and Maintenance of Natural Ester Insulating Liquid in TransformersThe evaluation and handling procedures for natural ester transformer insulating liquids are covered. The transformer operator is assiste ... active Project
C57.148 - Standard for Control Cabinets for Power TransformersThis document will provide users and manufacturers with a set of standard designs that can be easily specified. The document should grea ... active Project
C57.150 - Guide for the Transportation of Transformers and Reactors Rated 10,000 kVA or HigherThis guide is intended for the following purposes: a) To provide a transportation methodology to help minimize the risk of damage and de ... active Project
C57.160 - Guide for the Electrical Measurement of Partial Discharges in High Voltage Bushings and Instrument TransformersMeasurement of partial discharges in bushings and instrument transformers following an applied potential test should preferably be made ... active Project
C57.161 - IEEE Draft Guide for Dielectric Frequency Response TestThe purpose of this guide is to provide the user with information that will assist in performing Dielectric Frequency Response measureme ... active Project
C57.162 - Guide for the Interpretation of Moisture Related Parameters in Dry, Gas Insulated and Liquid Immersed Transformers and ReactorsThis guide recommends methods for: * the assessment of moisture and moisture related phenomena in dry, gas insulated and liquid immersed ... active Project
C57.164 - Guide for Establishing Short Circuit Withstand Capabilities of Liquid Immersed Power Transformers, Regulators, and ReactorsThis Guide describes theoretical and practical ways to evaluate liquid immersed power transformers, regulators, and reactors capabilitie ... active Project
C57.165 - Guide for Temperature Measurements for Liquid Immersed Transformers and ReactorsThis guide discusses and recommends methods of temperature measurements for liquid immersed transformers and reactors. Thermal well typ ... active Project
C62.11 - Standard for Metal-Oxide Surge Arresters for AC Power Circuits (> 1 kV)To define tests that demonstrate that an arrester can survive the rigors of reasonable environmental conditions and system phenomena whi ... active Project
C62.21 - Guide for the Application of Surge Voltage Protective Equipment on AC Rotating Machinery 1000 Volts and GreaterThis guide is intended to aid engineers at all levels of surge protection knowledge in deciding whether particular machines should have ... active Project
C62.22 - Guide for the Application of Metal-Oxide Surge Arresters for Alternating-Current SystemsThis guide covers the application of metal-oxide surge arresters [see IEEE Standard for Metal-Oxide Surge Arresters for AC Power Circuit ... active Project
C62.41.3 - Guide for Interactions Between Power System Disturbances and Surge Protective DevicesThe purpose of this document is to provide information on the interactions between power system disturbances and SPDs that is not readil ... active Project
C62.42.2 - Guide for the Application of Surge-Protective Components in Surge Protective Devices and Equipment Ports - Part 2 Metal-Oxide Varistors (MOVs)The C62.42 guide series covers surge protective components (SPCs) used in power and telecom surge protective devices (SPDs) and equipmen ... active Project
C62.42.4 - Guide for the Application of Surge-Protective Components in Surge Protective Devices and Equipment Ports - Part 4 Thermally Activated Current LimitersThe C62.42 guide series covers surge protective components (SPCs) used in power and telecom surge protective devices (SPDs) and equipmen ... active Project
C62.42.6 - Guide for the Application of Surge-Protective Components in Surge Protective Devices and Equipment Ports - Part 6 High Frequency Signal Isolation TransformersThe C62.42 guide series covers surge protective components (SPCs) used in power and telecom surge protective devices (SPDs) and equipmen ... active Project
C62.59 - Standard for Test Methods and Preferred Values for Silicon PN-Junction Clamping DiodesThis standard sets terms, test methods, test circuits, measurement procedures and preferred result values for diodes with one or more si ... active Project
C62.62 - IEEE Draft Standard Test Specifications for Surge-Protective Devices (SPDs) for Use on the Load Side of the Service Equipment in Low-Voltage (1000 V and Less) AC Power CircuitsSurge-protective devices (SPDs) intended to be installed on the load side of the service equipment connected to 50 Hz or 60 Hz AC power ... active Project
C62.82.2 - IEEE Draft Guide for the Application of Insulation CoordinationThe calculation method for selection of phase-to-ground and phase-to-phase insulation withstand voltages for equipment is presented. Thi ... active Project
C62.200 - Guide for the Application of Surge Protective Devices for a Wind Power FacilityThe purpose of this document is to provide guidance for the application of surge protective devices within a wind power facility. The gu ... active Project
C62.220 - Guide for the Application of Surge Protective Devices for the Smart GridThe purpose of this document is to outline how surge protective devices play an integral part in improving the operability and reliabili ... active Project
C62.230 - Guide for Surge Protection of Electric Vehicle InfrastructureThe purpose of this document is to provide guidance for the application of surge protective devices for electric vehicles while charging ... active Project
C93.5 - Standard for Power Line Carrier Transmitter/Receiver Equipment used to Transfer Discrete Teleprotection SignalsThis standard establishes requirements for power line carrier transmitters/receivers so that their interaction with the power system is ... active Project
C135.80-2012/Cor 1 - Standard for Fasteners for Overhead Line Construction - Corrigendum 1: Table 5 - Dimensions of Hex NutsThis standard covers the requirements of inch-based: (1) zinc-coated ferrous carriage bolts, machine bolts, double-arming bolts, double- ... active Project
C135.100 - Standard for Line Hardware for Overhead Line ConstructionLine hardware conforming to this standard shall, in all respects, meet the basic dimensional and performance requirements herein stated. ... active Project