IEEE-SA
STANDARDS BOARD STANDARDS REVIEW COMMITTEE (RevCom)
MEETING AGENDA
6 June 2007
9:00 a.m. – 2:00 p.m.
IEEE Operations Center, Piscataway, New Jersey
1 CALL TO ORDER
2 REVIEW AND APPROVAL OF AGENDA
3 APPROVAL OF THE 21 MARCH 2007 RevCom MINUTES
4 CONDITIONAL APPROVAL REPORT
5 ProCom LIAISON REPORT
6 TRIAL-USE UPGRADE OF 1522-2004 (SCC20)
7 PROPOSED STANDARDS FOR REVIEW AND RECOMMENDATION
7.1 New
P497-2002/Cor1/D3 (PE/NPE) IEEE Standard Criteria for Accident Monitoring Instrumentation for Nuclear Power Generating Stations - Corrigendum 1: Incorporation of User Feedback through 2005
P802.3-2005/Cor2/D2.0 (C/LM) IEEE Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local and Metropolitan Area Networks - Specific Requirements Part 3: Carrier Sense Multiple Access with Collision Detection (CSMA/CD) Access Method and Physical Layer Specifications - Corrigendum 2: IEEE Std 802.3an-2006 10GBASE-T Correction
P802.16g/D9 (C/LM + MTT) IEEE Standard for Local and Metropolitan Area Networks - Part 16: Air Interface for Fixed and Mobile Broadband Wireless Access Systems - Amendment 3: Management Plane Procedures and Services
P1542/D7 (PE/T&D) Guide for Installation, Maintenance, and Operation of Irrigation Equipment Located Near or Under Power Lines
P1578/D17 (PE/SB) Recommended Practice for Stationary Battery Electrolyte Spill Containment and Management
7.2 Revision
P125/D8.6 (PE/ED&PG) Recommended Practice for Preparation of Equipment Specifications for Speed-Governing of Hydraulic Turbines Intended to Drive Electric Generators
P142/D4 (IA/PSE) Recommended Practice for Grounding of Industrial and Commercial Power Systems
P487/D8 (PE/PSC) Recommended Practice for the Protection of Wire-Line Communication Facilities Serving Electric Supply Locations
7.3 Reaffirmation
120-1989 (R1997) (PE/PSIM) IEEE Master Test Guide for Electrical Measurements in Power Circuits
8 EARLY CONSIDERATION PROCESS
9 OLD BUSINESS
9.1 Visibility of Comments Ad Hoc Report - Grow
10 NEW BUSINESS
10.1 C/S2ESC and JTC1 Adoption Process Plan - Moore
11 NEXT MEETING
The next RevCom meeting will be Wednesday, 26
September 2007, in Piscataway, New Jersey. The
submittal deadline for this meeting is 17 August
2007.
12 ADJOURNMENT