-
-
UNAPPROVED AGENDA - Revised 5 May 2005
-
NEW STANDARDS COMMITTEE (NesCom)
-
8 June 2005
-
IEEE Operations Center
-
Piscataway, NJ
-
8:30 a.m.
-
1. CALL TO ORDER
2. REVIEW OF AGENDA
2.1 CONSENT AGENDA
2.1.1 PARs to be Withdrawn
SCC20 - Test and Diagnosis for Electronic Systems
P716.1 - User's Guide for the IEEE Std. For Signal Definition & Test Description (P716)
Vehicular Technology/Rail Transit
P1582 - Standard for Environmental Requirements for Rail Transit Automatic Train Control Systems Wayside Equipment
2.1.2 The sponsors of the following projects report a change in Working Group Chair:
Computer/Learning Technology Standards Committee
P1484.11.3 - Standard for Learning Technology eXtensible Markup Language (XML) Schema Binding for Data Model for Content Object Communication - Kerry Blinco
Industry Applications/Codes & Standards
P1606 - Guide for Comparison of Existing Electrical Safety Standards for Employee Workplace in North America and Europe - William E. Anderson, PE
Instrumentation and Measurement/TC-9 Sensor Technology
P1451.0 - Standard for a Smart Transducer Interface for Sensors and Actuators - Common Functions, Communication Protocols, and Transducer Electronic Data Sheet (TEDS) Formats - Kang Lee
Power Engineering/Transmission & Distribution
P1542 - Guide for Installation, Maintenance and Operation of Irrigation Equipment Located Near or Under Power Line - Dave Phillips
3. APPROVAL OF MINUTES FROM 19 MARCH 2005 MEETING
4. PARS FOR DISCUSSION
4.1 Target Extension Requests
Computer/Software & Systems Engineering Standards Committee
P1175.4 - Standard for CASE Tool Interconnections - Reference Model for Specifying System Behavior
Computer/Test Technology
P1450.3 - Standard for Extensions to Standard Test Interface Language (STIL) (IEEE Std. 1450-1999) for Tester Target Specification
Instrumentation and Measurement/TC-5 Connectors
P287 - Standard for Precision Coaxial Connectors (DC-110 GHZ)
Power Engineering/Energy Development & Power Generation
P125 - Recommended Practice for Preparation of Equipment Specifications for Speed Governing of Hydraulic Turbines Intended to Drive Electric Generators
4.2 New PARs
Computer/Learning Technology Standards Committee
P1484.11.4 - Standard for Learning Technology - Reference Model for Resource Aggregation for Learning, Education and Training
Computer/Microprocessors
P1953.2600 - Standard for Sequence Ontology
Power Engineering/Insulated Conductors
P971 - Guide for Control Architecture for High Power Electronics
Power Engineering/Power System Communications
PC93.4 - Standard for Power-Line Carrier Line-Tuning Equipment (30-500 kHz) Associated With Power Transmission Lines (Deferred from the March 2005 Meeting)
Power Engineering/Substations
P1613-2003/Cor 1 - Standard Environmental and Testing Requirements for Communications Networking Devices Installed in Electric Power Substations---Corrigendum 1: Removal of provisions for field impulse tests
P1676 - Guide for Control Architecture for High Power Electronics
P1677 - Application and User Guide for Gas-Insulated Transmission Lines (GIL)
Power Engineering/Transformers
PC57.12.91 - Standard Test Code for Dry-Type Distribution and Power Transformers
PC57.15 - Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators
Power Engineering/Transmission & Distribution
P1678 - Application Guide for Braced High Voltage Insulator Assemblies
SCC20 - Test and Diagnosis for Electronic Systems
P1671.1 - Standard Automatic Test Markup Language (ATML) for Exchanging Automatic Test Equipment and Test Information via XML: Exchanging Test Descriptions
P1671.2 - Standard Automatic Test Markup Language (ATML) for Exchanging Automatic Test Equipment and Test Information via XML: Exchanging Instrument Descriptions
4.4 Modified PARs
Broadcast Technology Society/RF Techniques
P1631 - 8-VSB DIGITAL TELEVISION TERRESTRIAL TRANSMISSION MASK COMPLIANCE FOR THE USA (Previously Approved PAR)
Computer Society/Software & Systems Engineering
P829 - Standard for Software and System Test Documentation (Previously Approved PAR) (Deferred from the March 2005 Meeting)
Vehicular Technology/Intelligent Transportation Systems
P1609.1 - Standard for Wireless Access in Vehicular Envirnments (WAVE)- Resource Manager (Previously Approved PAR)
P1609.3 - Standard for Wireless Access in Vehicular Environment (WAVE) - Networking Services (Previously Approved PAR)
P1609.4 - Standard for Wireless Access in Vehicular Environments (WAVE) - Multi-Channel Operations (Previously Approved PAR)
4.5 PARs for the Revisions of Standards
Computer/Microprocessors
P1596 - Standard for Scalable Coherent Interface (SCI) (Previously Approved PAR)
Computer Society/Software & Systems Engineering Standards Committee
P1044 - Standard Classification for Software Anomalies (Previously Approved PAR)
P2063 - Standard for System and Software Life Cycle ProcessesRequirements Engineering (Previously Approved PARs)
Industry Applications/Petroleum & Chemical Industry
P45 - Recommended Practice for Electrical Installations on Shipboard (Previously Approved PAR)
Power Engineering/Electric Machinery
P275 - Recommended Practice for Thermal Evaluation of Insulation Systems for Alternating-Current Electric Machinery Employing Form-Wound Pre-insulated Stator Coils for Machines Rated 6900 V and Below (Previously Approved PAR Not Available)
Power Engineering/Nuclear Power Engineering
P382 - Standard for Qualification of Actuators for Safety-Related Power-Operated Valve Assemblies for Nuclear Power Plants (Previously Approved PAR) (Deferred from the March 2005 Meeting)
Power Engineering/Power System Relaying
PC37.111 - Common Format for Transient Data Exchange (COMTRADE) for Power Systems (Previously Approved PAR)
PC37.113 - Guide for Protective Relay Applications to Transmission Lines (Previously Approved PAR)
Power Engineering/Surge Protective Devices/High Voltage
P1312 - Preferred Voltage Ratings for Alternating-Current Electrical Systems and Equipment Operating at Voltages Above 230 kV Nominal (Previously Approved PAR) (Deferred from the March 2005 Meeting)
PC62.92.5 - Guide for the Application of Neutral Grounding in Electrical Utility Systems, Part V - Transmission Systems and Subtransmission Systems (Previously Approved PAR) (Deferred from the March 2005 Meeting)
Power Engineering/Surge Protective Devices/Low Voltage
PC62.41.1 - Guide on the Surge Environment in Low-Voltage (1000 V and less) AC Power Circuits (Previously Approved PAR)
PC62.41.2 - Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and less) AC power circuits (Previously Approved PAR)
PC62.45 - Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage AC Power Circuits (Previously Approved PAR)
Power Engineering/Transmission & Distribution
PC135.1 - Standard for Zinc-Coated Steel Bolts and Nuts for Overhead Line Construction (Previously Approved PAR)
4.6 PAR to be Withdrawn Based on the Approval of New PAR
Power Engineering/Transformers
PC57.15 - Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators
- 5. REPORTS (Items of Interest to NesCom)
- 5.1 ProCom Liaison Report - Hermann Koch
- 5.2 PatCom Liaison Report - Chuck Adams
- 5.3 AudCom Liaison Report - Joseph Koepfinger
- 5.4 INCITS Report
6. OLD BUSINESS
6.1 Revision of the PAR Form for 2006 - Jodi Haasz
6.2 Analysis of Projects - Paul Nikolich
6.3 Discussion of Working Group Progress - Five Criteria - Paul Nikolich
6.4 Sponsor Charter Information - Paul Nikolich
6.5 Deadline for a Response to NesCom Member's Comments
7. NEW BUSINESS
7.1 IEEE-SA P&P for Working Group Finances and Meetings
7.2 Proposed Numbering Sequence for Bioinformatics Projects
7.3 myProject as it Relates to NesCom - Clyde Camp
7.4 Legal Review of PARs - Jodi Haasz
7.5 Discussion of Continuous Processing Program - Jodi Haasz
7.6 Training Materials for NesCom Members on the Review of PARs - Joanna Guenin
8. NEXT MEETING
The next continuous processing cycle will begin
on Monday, 11 July 2005. The conference call will
be held on Monday, 1 August 2005 at 11:00 am ET.
The next meeting of NesCom will take place on
Wednesday, 21 September 2005 at the IEEE Operations
Center in Piscataway, NJ.
9. ADJOURNMENT