NEW STANDARDS COMMITTEE (NESCOM)
Meeting Minutes
29 September 2010
8:30 a.m. – 1:30 p.m.
Berlin, Germany
| Members Present | Guests | Staff |
| Satish Aggarwal | Chuck Adams | Mary Ellen Hanntz |
| Bill Bartley | Hermann Koch | Bob LaBelle |
| Jean-Philippe Faure | John Kulick | Sue Vogel |
| Michael Janezic | Ron Petersen | Lisa Yacone, Administrator |
| Hung Ling | Thomas Wegmann | |
| Glenn Parsons | ||
| Tom Prevost, Chair | ||
| Jon Rosdahl | ||
| Members Absent: | ||
| Andy Drozd | ||
| Andy Ford | ||
| Alex Gelman | ||
| Dr. Young Kyun Kim | ||
| Ted Olsen | ||
| Mike Seavey |
1 CALL TO ORDER
Tom Prevost, Chair, called the meeting to order at 8:37 a.m. Introductions were made around the room.
{All votes are unanimous, unless otherwise stated.}
2 REVIEW AND APPROVAL OF AGENDA
A motion was made and seconded to approve the agenda. The motion passed.
2.1 Consent Agenda
2.1.1 PARs to be Withdrawn at the Request of the Sponsor
IEEE Computer Society/Test Technology
P1532-2002/Cor 1
IEEE Standard for In-System Configuration of Programmable Devices - Corrigendum 1
Recommendation: Approve PAR withdrawal.
IEEE Instrumentation and Measurement Society/TC10 - Waveform Generation Measurement and Analysis
P1696
Standard for Terminology and Test Methods for Circuit Probes
Recommendation: Approve PAR withdrawal.
IEEE Power and Energy Society/Surge Protective Devices/High Voltage
PC62.82.2
Guide for the Application of Insulation Coordination
Recommendation: Approve PAR withdrawal.
IEEE Power and Energy Society/Transmission and Distribution
P1453
Recommended Practice for Measurement and Limits of Voltage Fluctuations and Associated Light Flicker on AC
Power Systems
Recommendation: Approve PAR withdrawal.
P1695
Trial-Use Guide for Assessing Voltages at Publicly and Privately Accessible Locations
Recommendation: Approve PAR withdrawal.
2.1.2 Renumbering Request: P1712 to PC37.122.3
Recommendation: Approve
3 APPROVAL OF THE MINUTES OF THE 16 JUNE 2010 MEETING
A motion was made and seconded to approve the 16 June 2010 meeting minutes. Upon vote, the motion passed.
4 PARS FOR DISCUSSION
4.1 Modified PARs
IEEE Computer Society/Simulation Interoperability Stds Organization/Stds Activities Committee
P1278.1
Standard for Distributed Interactive Simulation - Application Protocols
Recommendation: Approve modified PAR until December 2011
IEEE Communications Society/Standards Committee
P1901
Standard for Broadband over Power Line Networks: Medium Access Control and Physical Layer Specifications
Recommendation: Approve modified PAR until December 2011
Jean-Philippe Faure recused himself.
IEEE Power and Energy Society/Energy Development & Power Generation
P807
Recommended Practice for Unique Identification in Hydroelectric Facilities
Recommendation: Approve modified PAR until December 2010
IEEE Power and Energy Society/Nuclear Power Engineering
P1682
Standard for Qualifying Fiber Optic Cables, Connections, and Optical Fiber Splices for Use in Safety Systems of
Nuclear Power Generating Stations
Recommendation: Approve modified PAR until December 2011
IEEE Power and Energy Society/Power System Relaying
PC37.239
Standard for Common Format for Event Data Exchange (COMFEDE) for Power Systems
Recommendation: Approve modified PAR until December 2012
IEEE Power and Energy Society/Surge Protective Devices/Low Voltage
PC62.37.1
Guide for the Application of Thyristor Surge Protective Device Components
Recommendation: Defer PAR to October continuous processing agenda due to lack of response to comments.
IEEE Power and Energy Society/Substations
P1711
Trial Use Standard for a Cryptographic Protocol for Cyber Security of Substation Serial Links
Recommendation: Approve modified PAR until December 2011
IEEE Power and Energy Society/Switchgear
PC37.10
Guide for Investigation, Analysis and Reporting of Power Circuit Breaker Failures
Recommendation: Approve modified PAR until December 2013
PC37.30.1
Standard Requirements For High Voltage Air Switches for Alternating Current, Rated Above 1,000 Volts
Recommendation: Approve modified PAR until December 2010
IEEE Power and Energy Society/Transformers
PC57.91
Guide for Loading Liquid Immersed Transformers and Voltage Regulators
Recommendation: Approve modified PAR until December 2010
PC57.148
Standard for Control Cabinets for Power Transformers
Recommendation: Approve modified PAR until December 2010
IEEE Vehicular Technology Society/Intelligent Transportation Systems
P1609.11
Standard for Wireless Access in Vehicular Environments (WAVE) - Over-the-Air Electronic Payment Data
Exchange Protocol for Intelligent Transportation Systems (ITS)
Recommendation: Approve modified PAR until December 2012
4.2 Extension Requests
IEEE Computer Society/LAN/MAN Standards Committee
P802.1AC
Standard for Media Access Control (MAC) Service Definition
Recommendation: Approve request for an extension until December 2012
P802.1AS
Standard for Local and Metropolitan Area Networks - Timing and Synchronization for Time-Sensitive Applications
in Bridged Local Area Networks
Recommendation: Approve for a one year extension until December 2011
P802.11s
IEEE Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local and Metropolitan Area Networks - Specific Requirements - Part 11: Wireless LAN Medium Access Control (MAC) and Physical Layer (PHY) Specifications Amendment: Mesh Networking
Recommendation: Approve request for an extension until December 2011
IEEE Computer Society/Learning Technology
P1484.13.1
Standard for Learning Technology - Conceptual Model for Resource Aggregation for Learning, Education, and
Training
Recommendation: Approve request for an extension until December 2011
IEEE Instrumentation and Measurement Society/TC10 - Waveform Generation Measurement and Analysis
P1658
Standard for Terminology and Test Methods of Digital-to-Analog Converter Devices
Recommendation: Approve request for an extension until December 2011
IEEE Power and Energy Society/Insulated Conductors
P1143
Guide on Shielding Practice for Low Voltage Cables
Recommendation: Approve request for an extension until December 2012
P1300
Guide for Cable Connections for Gas Insulated Substations
Recommendation: Approve request for an extension until December 2011
IEEE Power and Energy Society/Power System Relaying
PC37.236
Guide for Power System Protective Relay Applications over Digital Communication Channels
Recommendation: Approve for a one year extension until December 2011
IEEE Power and Energy Society/Surge Protective Devices/Low Voltage
PC62.62
Standard Test Specifications for Surge-Protective Devices (SPDs) for Use on the Load Side of the Service
Equipment in Low-Voltage (1000 V and Less) AC Power Circuits
Recommendation: Approve request for an extension until December 2011
IEEE Power and Energy Society/Substations
P80
Guide for Safety in AC Substation Grounding
Recommendation: Approve request for an extension until December 2012
IEEE Power and Energy Society/Switchgear
PC37.30.1
Standard Requirements for High Voltage Air Switches for Alternating Current, Rated Above 1,000 Volts
Recommendation: Approve request for an extension until December 2011
IEEE Power and Energy Society/Transmission and Distribution
P1250
Guide for Identifying and Improving Voltage Quality in Power Systems
Recommendation: Approve request for an extension until December 2011
IEEE Power and Energy Society/Transformers
PC57.148
Standard for Control Cabinets for Power Transformers
Recommendation: Approve request for an extension until December 2011
IEEE-SASB Coordinating Committees/SCC20 - Test and Diagnosis for Electronic Systems
P1232
Standard for Artificial Intelligence Exchange and Service Tie to All Test Environments (AI-ESTATE)
Recommendation: Approve request for an extension until December 2011
As extension requests were being discussed Lisa asked the NesCom members if they would like to see the PAR history information removed from the top of the extension requests, since the information does not necessarily link back to the original PAR. The members would still like to eventually see this information once it is fixed.
AI: Lisa will submit a ticket asking the programmers to hide this information on the PAR view until it is programmed to point all the way back to the original PAR.
4.3 New PARs
IEEE Computer Society/Environmental Assessment of Standards Committee
P1680.4
Standard for Environmental Assessment of Servers
Recommendation: Approve new PAR until December 2014
P1680.5
Standard for Environmental Assessment of Mobile Devices
Recommendation: Approve new PAR until December 2014
IEEE Computer Society/LAN/MAN Standards Committee
P802.11ah
IEEE Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local
and Metropolitan Area Networks - Specific Requirements - Part 11: Wireless LAN Medium Access Control (MAC)
and Physical Layer (PHY) Specifications: Amendment- Sub 1 GHz License-Exempt Operation
Recommendation: Approve new PAR until December 2014
P802.16p
Amendment to IEEE Standard for Local and Metropolitan Area Networks - Part 16: Air Interface for Broadband Wireless
Access Systems - Enhancements to Support Machine-to-Machine Applications
Recommendation: Approve new PAR until December 2014
IEEE Computer Society/Software & Systems Engineering Standards Committee
P15026-3
Standard for Systems and software engineering -- Systems and software assurance -- Part 3: System integrity levels
Recommendation: Approve new PAR until December 2014
IEEE Computer Society/Test Technology
P1851
Standard for Design Criteria of Integrated Sensor-based Test Applications for Household Appliances
Recommendation: Approve new PAR until December 2014
It was noted during the meeting that Mike Seavey, as chair of SCC20, is communicating offline with Mr. Guo, working group chair for P1851, to discuss the possibility that SCC20 has several standards that also address test applications, test results and the exchange of test information.
IEEE Instrumentation and Measurement Society/TC10 - Waveform Generation Measurement and Analysis
P1696
Standard for Terminology and Test Methods for Circuit Probes
Recommendation: Conditionally approve new PAR until December 2014 contingent upon changing the wording
of the Scope and Purpose to present tense
IEEE Power and Energy Society/Power System Relaying
PC37.242
Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMU) for Power
System Protection and Control
Recommendation: Approve new PAR until December 2014
PC37.243
Guide for Application of Digital Line Current Differential Relays Using Digital Communication
Recommendation: Approve new PAR until December 2014
IEEE Power and Energy Society/Stationary Batteries Committee
P1188a
Recommended Practice for Maintenance, Testing, and Replacement of Valve-Regulated Lead-Acid (VRLA)
Batteries for Stationary Applications; Updated VRLA Maintenance Considerations
Recommendation: Defer PAR to October continuous processing agenda due to edits needed in Purpose clause
IEEE Power and Energy Society/Substations
PC37.2a
IEEE Standard Electrical Power System Device Function Numbers, Acronyms, and Contact Designations: Amendment to
Device 7 Definition and to Device 16 Suffix Letter Usage, Revision of One and Addition of New Acronyms
Recommendation: Approve new PAR until December 2014
IEEE Power and Energy Society/Transmission and Distribution
P430
Standard Procedures for the Measurement of Radio Noise from Overhead Power Lines and Substations
Recommendation: Approve new PAR until December 2014
P1453
Recommended Practice for Measurement and Limits of Voltage Fluctuations and Associated Light Flicker on AC
Power Systems
Recommendation: Approve new PAR until December 2014
P1695
Trial-Use Guide for Assessing Voltages at Publicly and Privately Accessible Locations
Recommendation: Approve new PAR until December 2014
[Vote: Approve = 6, Disapprove = 1, Abstention = 1]
P1829
Guide for Conducting Corona Tests on Hardware for Overhead Transmission Lines and Substations
Recommendation: Approve new PAR until December 2014
[Vote: Approve = 7, Disapprove = 1]
IEEE Power and Energy Society/Transformers
PC57.13.7
Standard for Current Transformers with a Maximum mA Secondary Current of 250mA
Recommendation: Approve new PAR until December 2014
PC57.13-2008/Cor 1
IEEE Standard Requirements for Instrument Transformers - Corrigendum 1: Figure 3 Correction
Recommendation: Approve new PAR until December 2014
IEEE Reliability Society/IEEE Reliability
P61014
Standard for Programmes for Reliability Growth
Recommendation: Conditionally approve new PAR until December 2014 contingent upon "U.S." being added in
front of "Department of Defense" in 5.5.
IEEE-SASB Coordinating Committees/SCC21 - Fuel Cells, Photovoltaics, Dispersed Generation, and Energy
Storage
P2030.2
Guide for the Interoperability of Energy Storage Systems Integrated with the Electric Power Infrastructure
Recommendation: Approve new PAR until December 2014
Michael Janezic recused himself
4.4 PARs for the Revision of Standards
IEEE Computer Society/LAN/MAN Standards Committee
P802.15.4
Standard for Information Technology - Telecommunications and Information Exchange Between Systems - Local
and Metropolitan Area Networks - Specific Requirements - Part 15.4: Wireless Medium Access Control (MAC) and
Physical Layer (PHY) Specifications for Low Rate Wireless Personal Area Networks (WPANs)
Recommendation: Approve PAR for the revision of a standard until December 2014
IEEE Power and Energy Society/Power System Relaying
PC37.114
Guide for Determining Fault Location on AC Transmission and Distribution Lines
Recommendation: Approve PAR for the revision of a standard until December 2014
IEEE Power and Energy Society/Substations
P1527
Recommended Practice for the Design of Buswork Located in Seismically Active Areas
Recommendation: Approve PAR for the revision of a standard until December 2014
IEEE Power and Energy Society/Transmission and Distribution
P738
Standard for Calculating the Current-Temperature of Bare Overhead Conductors
Recommendation: Defer to October continuous processing agenda due to lack of response to comments.
P1283
Guide for Determining the Effects of High Temperature Operation on Conductors, Connectors, and Accessories
Recommendation: Approve PAR for the revision of a standard until December 2014
IEEE Power and Energy Society/Transformers
PC57.12.28
Standard for Pad Mounted Equipment - Enclosure Integrity
Recommendation: Approve PAR for the revision of a standard until December 2014
[Vote: Approve = 6, Disapprove = 1]
PC57.12.29
Standard for Pad Mounted Equipment - Enclosure Integrity for Coastal Environments
Recommendation: Approve PAR for the revision of a standard until December 2014
PC57.136
Guide for Sound Level Abatement and Determination for Liquid-Immersed Power Transformers and Shunt Reactors
Rated Over 500 kVA
Recommendation: Approve PAR for the revision of a standard until December 2014
5 OLD BUSINESS
5.1 Ad hoc - To determine if Scope can be updated in an Amendment PAR - Parsons
Nothing to report.
AI: Lisa will work with Glenn to set up a telecon for this ad hoc prior to December
5.2 Ad hoc - Adoption of Non-IEEE Draft Standard
Lisa presented slides with results from the initial meeting of this ad hoc, which were provided by ad hoc chair Mike Seavey. There was disagreement as to whether the OpsMan wording in 5.6 needs to be changed since the draft standard will be a published standard at the time of actual adoption. The ad hoc will continue its discussion of this matter.
6 NEW BUSINESS
No new business at this time.
7 NEXT MEETING
The next NesCom Continuous Processing telecon is scheduled for 29 October 2010 at 9:00 a.m. ET.
The next face to face NesCom meeting is scheduled for 7 December 2010 in Piscataway, NJ, USA. The submittal deadline of PARs for the December agenda is 18 October 2010.
8 ADJOURNMENT
There being no further business, the meeting was adjourned at 11:38 a.m.